Difference between revisions of "Lone Star West Texas Gateway NGL Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Source: Permian and Delaware Basins in West Texas
 
* Source: Permian and Delaware Basins in West Texas
Line 8: Line 8:
 
** http://www.energytransfer.com
 
** http://www.energytransfer.com
 
* Length:  kilometres (570 miles)  
 
* Length:  kilometres (570 miles)  
* Capacity: 230,000 barrels of oil per day  
+
* Capacity: 495,000 barrels of oil per day  
 
* Crude Type: natural gas liquids (NGLs)
 
* Crude Type: natural gas liquids (NGLs)
  
+++ Brief Description
+
=== Brief Description ===
  
 
* The 570-mile, 16-inch pipeline, transports natural gas liquids (NGLs) produced in the Permian and Delaware Basins in West Texas to Mont Belvieu, Texas
 
* The 570-mile, 16-inch pipeline, transports natural gas liquids (NGLs) produced in the Permian and Delaware Basins in West Texas to Mont Belvieu, Texas
 
* It connects with the [[Justice NGL Pipeline]]
 
* It connects with the [[Justice NGL Pipeline]]
 +
* In 2020 an extension of the pipeline into the Permian Basin, with originations near Wink, Texas, connecting to 30-inch mainline near Fort Worth, Texas.
  
+++ Pipeline Status
+
=== Pipeline Status ===
 
* Operating
 
* Operating
  
+++ History
+
=== History ===
 
* 2012 - Energy Transfer Partners and Regency Energy Partners Announce Early Completion of the Gateway Pipeline
 
* 2012 - Energy Transfer Partners and Regency Energy Partners Announce Early Completion of the Gateway Pipeline
 +
* 2016 - Pipeline expanded to 375,000 bpd and then 495,000 bpd
 +
* 2020 - The pipeline was extended to Fort Worth
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
 
# [[EIA Liquids Pipeline Projects 2010-2014]]
 
# [[EIA Liquids Pipeline Projects 2010-2014]]
 +
# [[EIA Liquids Pipeline Projects 2015-2020]]
 
# [http://killajoules.wikidot.com/blog:3486 Energy Transfer Partners and Regency Energy Partners Announce Early Completion of Lone Star’s Gateway Pipeline]
 
# [http://killajoules.wikidot.com/blog:3486 Energy Transfer Partners and Regency Energy Partners Announce Early Completion of Lone Star’s Gateway Pipeline]

Latest revision as of 13:38, 28 September 2023

Summary Information

  • Source: Permian and Delaware Basins in West Texas
  • Destination: Mont Belvieu, Texas
  • Ownership: Energy Transfer Partners, and Regency Energy Partners
  • Website:
  • Length: kilometres (570 miles)
  • Capacity: 495,000 barrels of oil per day
  • Crude Type: natural gas liquids (NGLs)

Brief Description

  • The 570-mile, 16-inch pipeline, transports natural gas liquids (NGLs) produced in the Permian and Delaware Basins in West Texas to Mont Belvieu, Texas
  • It connects with the Justice NGL Pipeline
  • In 2020 an extension of the pipeline into the Permian Basin, with originations near Wink, Texas, connecting to 30-inch mainline near Fort Worth, Texas.

Pipeline Status

  • Operating

History

  • 2012 - Energy Transfer Partners and Regency Energy Partners Announce Early Completion of the Gateway Pipeline
  • 2016 - Pipeline expanded to 375,000 bpd and then 495,000 bpd
  • 2020 - The pipeline was extended to Fort Worth

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2010-2014
  2. EIA Liquids Pipeline Projects 2015-2020
  3. Energy Transfer Partners and Regency Energy Partners Announce Early Completion of Lone Star’s Gateway Pipeline