Larut Oil Field

From A Barrel Full
Revision as of 10:07, 26 October 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Exxon * Country: Malaysia * Location: PM5 * Production start: 2002 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: Exxon
  • Country: Malaysia
  • Location: PM5
  • Production start: 2002
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Larut is an eight-legged steel jacket platform with a 36 well capacity.
  • Oil and gas will flow from Larut into the existing Tapis oil and gas system via approximately 125 miles of new pipelines

+++ Contractors

  • **MMC:** Detailed Design of Larut A Jacket and Pipeline

+++ History

  • 2002 - Larut Oil Field comes onstream

+++ Geology

+++ Links

  1. Detailed Design of Larut A Jacket and Pipeline (1998 - 1999)
  2. ExxonMobil Invests in Southeast Asia's Energy Needs as Third New Malaysian Project Comes Onstream