Larut Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Exxon
- Country: Malaysia
- Location: PM5
- Production start: 2002
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Larut is an eight-legged steel jacket platform with a 36 well capacity.
- Oil and gas will flow from Larut into the existing Tapis oil and gas system via approximately 125 miles of new pipelines
+++ Contractors
- **MMC:** Detailed Design of Larut A Jacket and Pipeline
+++ History
- 2002 - Larut Oil Field comes onstream
+++ Geology
+++ Links