Difference between revisions of "LNG Terminal Projects Completed in 2020"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 17: | Line 17: | ||
# [[Mundra LNG Terminal]] | # [[Mundra LNG Terminal]] | ||
# [[Port Qasim Floating LNG Terminal]] expansion | # [[Port Qasim Floating LNG Terminal]] expansion | ||
+ | # [[Sergipe LNG Terminal]] | ||
# [[Yangshan Shanghai LNG Terminal]] | # [[Yangshan Shanghai LNG Terminal]] | ||
# [[Zhejiang Ningbo LNG Terminal]], expansion | # [[Zhejiang Ningbo LNG Terminal]], expansion |
Latest revision as of 08:45, 18 January 2022
Summary
- Global liquefaction capacity increased by about 20 mn tons with the completion of 3 projects in the USA
- Regasification capacity increased by about 16 mn tons,
Liquefaction Terminals
- The second and third trains of Cameron LNG Export Terminal Project began operations
- Phase two of the Elba Island LNG Terminal began operations
- The second and third trains of Freeport LNG Terminal began operations