− | # [[ | + | === Summary === |
+ | |||
+ | * Global liquefaction capacity increased by about 20 mn tons with the completion of 3 projects in the USA | ||
+ | * Regasification capacity increased by about 16 mn tons, | ||
+ | |||
+ | === Liquefaction Terminals === | ||
+ | |||
+ | # The second and third trains of [[Cameron LNG Export Terminal Project]] began operations | ||
+ | # Phase two of the [[Elba Island LNG Terminal]] began operations | ||
+ | # The second and third trains of [[Freeport LNG Terminal]] began operations | ||
+ | |||
+ | === Regasification Terminals === | ||
+ | |||
+ | # [[Bahrain Floating LNG Terminal Project]] | ||
+ | # The [[Ishikari LNG Terminal]] was expanded | ||
+ | # [[Mundra LNG Terminal]] | ||
+ | # [[Port Qasim Floating LNG Terminal]] expansion | ||
+ | # [[Sergipe LNG Terminal]] | ||
+ | # [[Yangshan Shanghai LNG Terminal]] | ||
+ | # [[Zhejiang Ningbo LNG Terminal]], expansion |
Latest revision as of 08:45, 18 January 2022
Summary
- Global liquefaction capacity increased by about 20 mn tons with the completion of 3 projects in the USA
- Regasification capacity increased by about 16 mn tons,
Liquefaction Terminals
- The second and third trains of Cameron LNG Export Terminal Project began operations
- Phase two of the Elba Island LNG Terminal began operations
- The second and third trains of Freeport LNG Terminal began operations