+ | === Summary === | ||
+ | |||
+ | * Global liquefaction capacity increased by about 20 mn tons with the completion of 3 projects in the USA | ||
+ | * Regasification capacity increased by about 18 mn tons, | ||
=== Liquefaction Terminals === | === Liquefaction Terminals === | ||
# The second and third trains of [[Cameron LNG Export Terminal Project]] began operations | # The second and third trains of [[Cameron LNG Export Terminal Project]] began operations | ||
+ | # Phase two of the [[Elba Island LNG Terminal]] began operations | ||
+ | # The second and third trains of [[Freeport LNG Terminal]] began operations | ||
− | + | === Regasification Terminals === | |
# [[Bahrain Floating LNG Terminal Project]] | # [[Bahrain Floating LNG Terminal Project]] | ||
+ | # The [[Ishikari LNG Terminal]] was expanded | ||
# [[Mundra LNG Terminal]] | # [[Mundra LNG Terminal]] | ||
+ | # [[Port Qasim Floating LNG Terminal]] expansion | ||
# [[Yangshan Shanghai LNG Terminal]] | # [[Yangshan Shanghai LNG Terminal]] | ||
# [[Zhejiang Ningbo LNG Terminal]], expansion | # [[Zhejiang Ningbo LNG Terminal]], expansion |
Revision as of 11:01, 17 January 2022
Summary
- Global liquefaction capacity increased by about 20 mn tons with the completion of 3 projects in the USA
- Regasification capacity increased by about 18 mn tons,
Liquefaction Terminals
- The second and third trains of Cameron LNG Export Terminal Project began operations
- Phase two of the Elba Island LNG Terminal began operations
- The second and third trains of Freeport LNG Terminal began operations
Regasification Terminals
- Bahrain Floating LNG Terminal Project
- The Ishikari LNG Terminal was expanded
- Mundra LNG Terminal
- Port Qasim Floating LNG Terminal expansion
- Yangshan Shanghai LNG Terminal
- Zhejiang Ningbo LNG Terminal, expansion