LNG Terminal Projects Completed in 2017

From A Barrel Full
Jump to navigation Jump to search

Introduction

  • 24.5 million tons of liquefaction capacity was commissioned

Export Terminals

  1. The 3rd train of Gorgon LNG Terminal started operations
  2. Train 9 of the Malaysia LNG Terminal,
  3. Malaysia Satu FLNG Terminal
  4. Trains 3 & 4 of the Sabine Pass LNG Terminal
  5. Wheatstone LNG Terminal
  6. Train one of the Yamal LNG Terminal

Import Terminals

  1. Dunkerque LNG Terminal
  2. Etki LNG Terminal
  3. Guangdong Yuedong LNG
  4. Qidong LNG

Boryeong RGT-2 (Pengerang LNG) Delimara LNG PGPC Port Qasim Singapore LNG Expansion Map Ta Phut LNG Expansion 1