LNG Terminal Projects Completed in 2017

From A Barrel Full
Revision as of 15:05, 21 December 2021 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Introduction

  • 24.5 million tons of liquefaction capacity was commissioned

Export Terminals

  1. The 3rd train of Gorgon LNG Terminal started operations
  2. Train 9 of the Malaysia LNG Terminal,
  3. Malaysia Satu FLNG Terminal
  4. Trains 3 & 4 of the Sabine Pass LNG Terminal
  5. Train one of the Yamal LNG Terminal

Import Terminals

Qidong LNG Guangdong Yuedong LNG

  1. Dunkerque LNG Terminal

Boryeong RGT-2 (Pengerang LNG) Delimara LNG PGPC Port Qasim Singapore LNG Expansion Map Ta Phut LNG Expansion 1 Etki LNG