LNG Terminal Projects Completed in 2017

From A Barrel Full
Jump to navigation Jump to search

Introduction

  • 24.5 million tons of liquefaction capacity was commissioned

Export Terminals

  1. The 3rd train of Gorgon LNG Terminal started operations
  2. Train 9 of the Malaysia LNG Terminal,
  3. Malaysia Satu FLNG Terminal
  4. Trains 3 & 4 of the Sabine Pass LNG Terminal
  5. Train one of the Yamal LNG Terminal


Import Terminals