Difference between revisions of "LNG Terminal Projects Completed in 2017"

From A Barrel Full
Jump to navigation Jump to search
Line 13: Line 13:
 
==== Import Terminals ====
 
==== Import Terminals ====
  
 +
# [[Boryeong LNG Terminal]]
 +
# [[Delimara Malta Floating LNG Terminal]]
 
# [[Dunkerque LNG Terminal]]
 
# [[Dunkerque LNG Terminal]]
 
# [[Etki LNG Terminal]]
 
# [[Etki LNG Terminal]]
 
# [[Guangdong Yuedong LNG]]
 
# [[Guangdong Yuedong LNG]]
 +
# [[Pengerang Johur LNG Terminal]]
 +
# [[Port Qasim Floating LNG Terminal]]
 
# [[Qidong LNG]]
 
# [[Qidong LNG]]
Boryeong
+
# [[Singapore LNG Terminal]], expansion
RGT-2 (Pengerang LNG)
+
 
Delimara LNG
+
 
PGPC Port Qasim
+
 
Singapore LNG Expansion
+
 
 
Map Ta Phut LNG Expansion 1
 
Map Ta Phut LNG Expansion 1

Revision as of 14:41, 25 June 2022

Introduction

  • 24.5 million tons of liquefaction capacity was commissioned

Export Terminals

  1. The 3rd train of Gorgon LNG Terminal started operations
  2. Train 9 of the Malaysia LNG Terminal,
  3. Malaysia Satu FLNG Terminal
  4. Trains 3 & 4 of the Sabine Pass LNG Terminal
  5. Wheatstone LNG Terminal
  6. Train one of the Yamal LNG Terminal

Import Terminals

  1. Boryeong LNG Terminal
  2. Delimara Malta Floating LNG Terminal
  3. Dunkerque LNG Terminal
  4. Etki LNG Terminal
  5. Guangdong Yuedong LNG
  6. Pengerang Johur LNG Terminal
  7. Port Qasim Floating LNG Terminal
  8. Qidong LNG
  9. Singapore LNG Terminal, expansion



Map Ta Phut LNG Expansion 1