Difference between revisions of "LNG Terminal Projects Completed in 2017"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
==== Import Terminals ==== | ==== Import Terminals ==== | ||
+ | # [[Boryeong LNG Terminal]] | ||
+ | # [[Delimara Malta Floating LNG Terminal]] | ||
# [[Dunkerque LNG Terminal]] | # [[Dunkerque LNG Terminal]] | ||
# [[Etki LNG Terminal]] | # [[Etki LNG Terminal]] | ||
# [[Guangdong Yuedong LNG]] | # [[Guangdong Yuedong LNG]] | ||
+ | # [[Pengerang Johur LNG Terminal]] | ||
+ | # [[Port Qasim Floating LNG Terminal]] | ||
# [[Qidong LNG]] | # [[Qidong LNG]] | ||
− | + | # [[Singapore LNG Terminal]], expansion | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
Map Ta Phut LNG Expansion 1 | Map Ta Phut LNG Expansion 1 |
Revision as of 14:41, 25 June 2022
Introduction
- 24.5 million tons of liquefaction capacity was commissioned
Export Terminals
- The 3rd train of Gorgon LNG Terminal started operations
- Train 9 of the Malaysia LNG Terminal,
- Malaysia Satu FLNG Terminal
- Trains 3 & 4 of the Sabine Pass LNG Terminal
- Wheatstone LNG Terminal
- Train one of the Yamal LNG Terminal
Import Terminals
- Boryeong LNG Terminal
- Delimara Malta Floating LNG Terminal
- Dunkerque LNG Terminal
- Etki LNG Terminal
- Guangdong Yuedong LNG
- Pengerang Johur LNG Terminal
- Port Qasim Floating LNG Terminal
- Qidong LNG
- Singapore LNG Terminal, expansion
Map Ta Phut LNG Expansion 1