Difference between revisions of "LNG Terminal Projects Completed in 2017"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
# [[Malaysia Satu FLNG Terminal]] | # [[Malaysia Satu FLNG Terminal]] | ||
# Trains 3 & 4 of the [[Sabine Pass LNG Terminal]] | # Trains 3 & 4 of the [[Sabine Pass LNG Terminal]] | ||
+ | # [[Wheatstone LNG Terminal]] | ||
# Train one of the [[Yamal LNG Terminal]] | # Train one of the [[Yamal LNG Terminal]] | ||
Revision as of 12:49, 3 February 2022
Introduction
- 24.5 million tons of liquefaction capacity was commissioned
Export Terminals
- The 3rd train of Gorgon LNG Terminal started operations
- Train 9 of the Malaysia LNG Terminal,
- Malaysia Satu FLNG Terminal
- Trains 3 & 4 of the Sabine Pass LNG Terminal
- Wheatstone LNG Terminal
- Train one of the Yamal LNG Terminal
Import Terminals
Boryeong RGT-2 (Pengerang LNG) Delimara LNG PGPC Port Qasim Singapore LNG Expansion Map Ta Phut LNG Expansion 1