Difference between revisions of "LNG Terminal Projects Completed in 2017"

From A Barrel Full
Jump to navigation Jump to search
Line 12: Line 12:
 
==== Import Terminals ====
 
==== Import Terminals ====
  
Qidong LNG
+
# [[Qidong LNG]]
 
Guangdong Yuedong LNG
 
Guangdong Yuedong LNG
 
# [[Dunkerque LNG Terminal]]
 
# [[Dunkerque LNG Terminal]]

Revision as of 12:19, 7 January 2022

Introduction

  • 24.5 million tons of liquefaction capacity was commissioned

Export Terminals

  1. The 3rd train of Gorgon LNG Terminal started operations
  2. Train 9 of the Malaysia LNG Terminal,
  3. Malaysia Satu FLNG Terminal
  4. Trains 3 & 4 of the Sabine Pass LNG Terminal
  5. Train one of the Yamal LNG Terminal

Import Terminals

  1. Qidong LNG

Guangdong Yuedong LNG

  1. Dunkerque LNG Terminal

Boryeong RGT-2 (Pengerang LNG) Delimara LNG PGPC Port Qasim Singapore LNG Expansion Map Ta Phut LNG Expansion 1 Etki LNG