Difference between revisions of "LNG Terminal Projects Completed in 2017"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
# Train one of the [[Yamal LNG Terminal]] | # Train one of the [[Yamal LNG Terminal]] | ||
+ | ==== Import Terminals ==== | ||
− | + | Qidong LNG | |
− | + | Guangdong Yuedong LNG | |
+ | # [[Dunkerque LNG Terminal]] | ||
+ | Boryeong | ||
+ | RGT-2 (Pengerang LNG) | ||
+ | Delimara LNG | ||
+ | PGPC Port Qasim | ||
+ | Singapore LNG Expansion | ||
+ | Map Ta Phut LNG Expansion 1 | ||
+ | Etki LNG |
Revision as of 15:05, 21 December 2021
Introduction
- 24.5 million tons of liquefaction capacity was commissioned
Export Terminals
- The 3rd train of Gorgon LNG Terminal started operations
- Train 9 of the Malaysia LNG Terminal,
- Malaysia Satu FLNG Terminal
- Trains 3 & 4 of the Sabine Pass LNG Terminal
- Train one of the Yamal LNG Terminal
Import Terminals
Qidong LNG Guangdong Yuedong LNG
Boryeong RGT-2 (Pengerang LNG) Delimara LNG PGPC Port Qasim Singapore LNG Expansion Map Ta Phut LNG Expansion 1 Etki LNG