Difference between revisions of "LNG Terminal Projects Completed in 2017"

From A Barrel Full
Jump to navigation Jump to search
Line 10: Line 10:
 
# Train one of the [[Yamal LNG Terminal]]
 
# Train one of the [[Yamal LNG Terminal]]
  
 +
==== Import Terminals ====
  
 
+
Qidong LNG
==== Import Terminals ====
+
Guangdong Yuedong LNG
 +
# [[Dunkerque LNG Terminal]]
 +
Boryeong
 +
RGT-2 (Pengerang LNG)
 +
Delimara LNG
 +
PGPC Port Qasim
 +
Singapore LNG Expansion
 +
Map Ta Phut LNG Expansion 1
 +
Etki LNG

Revision as of 15:05, 21 December 2021

Introduction

  • 24.5 million tons of liquefaction capacity was commissioned

Export Terminals

  1. The 3rd train of Gorgon LNG Terminal started operations
  2. Train 9 of the Malaysia LNG Terminal,
  3. Malaysia Satu FLNG Terminal
  4. Trains 3 & 4 of the Sabine Pass LNG Terminal
  5. Train one of the Yamal LNG Terminal

Import Terminals

Qidong LNG Guangdong Yuedong LNG

  1. Dunkerque LNG Terminal

Boryeong RGT-2 (Pengerang LNG) Delimara LNG PGPC Port Qasim Singapore LNG Expansion Map Ta Phut LNG Expansion 1 Etki LNG