Difference between revisions of "LNG Terminal Projects Completed in 2017"

From A Barrel Full
Jump to navigation Jump to search
Line 1: Line 1:
 
=== Introduction ===
 
=== Introduction ===
 
+
* 24.5 million tons of liquefaction capacity was commissioned
  
 
==== Export Terminals ====
 
==== Export Terminals ====
  
 
# The 3rd train of [[Gorgon LNG Terminal]] started operations
 
# The 3rd train of [[Gorgon LNG Terminal]] started operations
 +
# Train 9 of the [[Malaysia LNG Terminal,]]
 
# [[Malaysia Satu FLNG Terminal]]
 
# [[Malaysia Satu FLNG Terminal]]
 +
# Trains 3 & 4 of the [[Sabine Pass LNG Terminal]]
 +
# Train one of the [[Yamal LNG Terminal]]
 +
  
  
 
==== Import Terminals ====
 
==== Import Terminals ====

Revision as of 15:03, 21 December 2021

Introduction

  • 24.5 million tons of liquefaction capacity was commissioned

Export Terminals

  1. The 3rd train of Gorgon LNG Terminal started operations
  2. Train 9 of the Malaysia LNG Terminal,
  3. Malaysia Satu FLNG Terminal
  4. Trains 3 & 4 of the Sabine Pass LNG Terminal
  5. Train one of the Yamal LNG Terminal


Import Terminals