Hewett Gas Field
Summary Information
- Operator: ENI
- Country: UK
- Location: 28 kilometres north-east of Bacton in Norfolk
- Production start: 1969
- Partners: Eni, Perenco
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Hewett field offshore installations comprise six offshore installations
* The A Platform, FTP Platform & Q Platform are manned * The 52/5 A Platform, B Platform & C Platform are unmanned
- Gas from the processing complex is exported to the [[[Bacton Gas Plant]]].
- The Hewett pipeline system carries gas from the Hewett, Dawn, Delilah and Della fields
- Eni planned to convert the Hewett Gas Field into a gas storage facility, but it is now being evaluated as a CO,,2,, sequestration site
+++ Contractors
- **Emtunga:** Living quarters for original platform
- **Aquaterra:** Project management from design and onshore fabrication through to offshore installation to create a new well slot
- **Saipem:** Engineering Services for the Platform
- **OTS:** 52/5A & 48/29 Platform Installation
- **McDermott:** Living Quarters - Engineering, procurement, construction, transportation
- **Seaway Heavy Lifting:**
* T & I of Modules for Hewett Bacton Project * Della PLEM and Little Dotty MTM
+++ History
- 1964 - The original seismic cube over the Hewett and D-Fields (Survey PH943F0003) was acquired
- 1969 - Project development approved by UK Government
- 1969 - The Hewett field complex began production
- 2001 - BP sells ARCO's share of the field to Tullow
- 2005 - Centrica sells its stake to Petrofac
- 2008 - Eni completed the acquisition of a 51.69% equity interest from Tullow
+++ Geology
Links
- Hewett Field Infrastructure, Eni
- Seaway Heavy Lifting Oil And Gas References
- Saipem Fixed Offshore Production Facilities Engineering Refe
- McDermott Platform References
- FoundOcean Europe Subsea References
- Emtunga Offshore Platform References
- Centrica disposes of equity gas interest in Hewett offshore assets
- BP Fulfils EC Undertaking With Gas Sale To Tullow Oil
- Tullow Oil – Hewett Rotliegendes Project
- Proposed sale of Hewett Unit interest to Eni
- Eni completes acquisition of a large majority stake in the UK off-shore Hewett Unit and the Bacton onshore gas processing terminal to develop storage facilities
- Assessment of Natural Integrity, Kingsnorth Carbon Capture & Storage Project
- Hewett Gas Field Decommisioning