Difference between revisions of "Guangdong Huizhou LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 32: | Line 32: | ||
- | - | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2022/01/tge-shanghai-signs-tank-epc-contract.html TGE Shanghai signs tank EPC contract with Guangdong Huizhou LNG Co., Ltd.] |
[[category:LNG]] | [[category:LNG]] | ||
− | [[category: | + | [[category:China]] |
− |
Revision as of 16:33, 6 January 2022
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: 6.2 million tons/annum
- Status: Under construction
Brief Description
- In the first phase of the project will include the construction of a jetty and three LNG storage tanks of a 200 000 m3 capacity each and will have a regasification capacity of 6.2 MTPA.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2021 - Construction of the project started
Other Information
-