Difference between revisions of "Guangdong Huizhou LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 4: | Line 4: | ||
* Website: | * Website: | ||
* Location: | * Location: | ||
− | * Capacity: million tons/annum | + | * Capacity: 6.0 million tons/annum |
− | * Status: | + | * Status: Under construction |
+ | |||
=== Brief Description === | === Brief Description === | ||
* In the first phase of the project will include the construction of a jetty and three LNG storage tanks of a 200 000 m3 capacity each and will have a regasification capacity of 6.2 MTPA. | * In the first phase of the project will include the construction of a jetty and three LNG storage tanks of a 200 000 m3 capacity each and will have a regasification capacity of 6.2 MTPA. |
Revision as of 14:58, 6 January 2022
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: 6.0 million tons/annum
- Status: Under construction
Brief Description
- In the first phase of the project will include the construction of a jetty and three LNG storage tanks of a 200 000 m3 capacity each and will have a regasification capacity of 6.2 MTPA.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2021 - Construction of the project started
Other Information
-