Difference between revisions of "Guangdong Huizhou LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...") |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
* Status: | * Status: | ||
=== Brief Description === | === Brief Description === | ||
− | + | * In the first phase of the project will include the construction of a jetty and three LNG storage tanks of a 200 000 m3 capacity each and will have a regasification capacity of 6.2 MTPA. | |
=== Technical Details === | === Technical Details === |
Revision as of 14:57, 6 January 2022
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status:
Brief Description
- In the first phase of the project will include the construction of a jetty and three LNG storage tanks of a 200 000 m3 capacity each and will have a regasification capacity of 6.2 MTPA.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 200X -
Other Information
-