Difference between revisions of "Guangdong Huizhou LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...")
 
Line 7: Line 7:
 
* Status:  
 
* Status:  
 
=== Brief Description ===
 
=== Brief Description ===
 
+
* In the first phase of the project will include the construction of a jetty and three LNG storage tanks of a 200 000 m3 capacity each and will have a regasification capacity of 6.2 MTPA.
  
 
=== Technical Details ===
 
=== Technical Details ===

Revision as of 14:57, 6 January 2022

Summary Information

  • Ownership:
  • Website:
  • Location:
  • Capacity: million tons/annum
  • Status:

Brief Description

  • In the first phase of the project will include the construction of a jetty and three LNG storage tanks of a 200 000 m3 capacity each and will have a regasification capacity of 6.2 MTPA.

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 200X -

Other Information

-

Links