Grissik-Batam-Singapore Gas Pipeline
Revision as of 13:49, 16 February 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Indonesia * Destination: Singapore * Ownership: Transgasindo TGI * Website: http://www.tgi.co.id/ * Length: 470-km kilometres ( miles) * Capa...")
Summary Information
- Source: Indonesia
- Destination: Singapore
- Ownership: Transgasindo TGI
- Website: http://www.tgi.co.id/
- Length: 470-km kilometres ( miles)
- Capacity: 650 mmscf/day
- Status: Operating
+++ Details
- The 470-km pipeline, designed for a throughput capacity of 650 mmscf/day, brings natural gas from Indonesia’s Sumatra Island to Singapore
+++ History
- 2003 - Pipeline operations started
+++ Other Information
- -
+++ Links