Difference between revisions of "Greater Plutonio Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Operator: BP Country: Angola Location: Block 18, Offshore Production start: 2007 Partners: BP - 50%, Sonangol Sinopec International (SSI) - 50% Type: Oil...")
 
Line 33: Line 33:
 
Geology
 
Geology
  
Links
+
=== Links ===
  
 
Serimax Pipeline References
 
Serimax Pipeline References
Line 46: Line 46:
 
HHI wins large FPSO order worth $350 million
 
HHI wins large FPSO order worth $350 million
 
BP Amoco Third Operated Oil Discovery In Angola
 
BP Amoco Third Operated Oil Discovery In Angola
 +
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-significant_15.html TechnipFMC Awarded a Significant Integrated EPCI (iEPCI™) Contract for the BP Platina Field in Angola]

Revision as of 18:08, 15 August 2020

Summary Information

Operator: BP Country: Angola Location: Block 18, Offshore Production start: 2007 Partners: BP - 50%, Sonangol Sinopec International (SSI) - 50% Type: Oil - Greater Plutonio is a low sulphur, medium gravity crude oil. Estimated Reserves: Production Volume: Description

The Greater Plutonio offshore development area is located 160 kilometres northwest of Luanda and is comprised of the Galio, Cromio, Paladio, Plutonio and Cobalto fields in water depths varying from 1200 to 1450 metres. It will contain 43 wells: 20 producers, 20 water injectors, and 3 gas injectors. The development utilizes a floating, production, storage and offloading vessel (FPSO) to process produced fluids and export crude. The FPSO is connected to the wells by a large subsea system. The Greater Plutonio FPSO consists of the hull capable of storing 2 million bbls of crude oil and the topside designed to produce and refine 200,000 bbls of crude oil a day and accommodate 120 crew members. Contractors

Stolt Offshore and Technip: installation of over 75km of 12-inch diameter insulated production, gas injection and service flowlines, 103km of umbilicals. In addition, the consortium will install the 12 FPSO mooring lines and 10 production manifolds, to tie-in the subsea wells and the final hook-up of the FPSO by means of a single riser tower KBR: Engineering, procurement, construction & management (EPCM) Hyundai Heavy Industries: Contract to fabricate the FPSO hull and topside equipment Acergy: Subsea Installation History

1996 - Block 18 and its operatorship was awarded 1999 - Oil discovered at Paladio well 2000 - Oil discovered at Plutonio well 2000 - Oil discovered at Galio well 2001 - BP and Shell announced two further oil discoveries 2004 - BP Receives Authorisation For Greater Plutonio 2004 - ONGC aquires 50% from Shell 2004 - HHI awarded FPSO hull and topsides contract 2004 - Stolt Offshore and Technip awarded subsea contract 2007 - Production Begins at Greater Plutonio Geology

Links

Serimax Pipeline References BP Greater Plutonio Prospect On Track In Angola Stolt Offshore S.A. announces $550 million contract win in deepwater Angola Production Begins at Greater Plutonio OVL Reaches Agreement With SHELL To Acquire Latter's 50 Per Cent Interest In Angola Block 18 BP Receives Authorisation For Greater Plutonio BP Amoco Angola Oil Discovery BP's Fourth Operated Oil Discovery In Angola Greater Plutonio, KBR HHI wins large FPSO order worth $350 million BP Amoco Third Operated Oil Discovery In Angola

  1. TechnipFMC Awarded a Significant Integrated EPCI (iEPCI™) Contract for the BP Platina Field in Angola