Difference between revisions of "Gjøa Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Operator: GDF Suez Country: Norway Location: off the coast of the city of Florø Production start: 2010 Partners: Wintershall, Okea 12% Type: Oil & Gas Es...")
 
 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 +
* Operator: Neptune Energy
 +
* Country: Norway
 +
* Location: off the coast of the city of Florø
 +
* Production start: 2010
 +
* Partners: Wintershall, Okea 12%
 +
* Type: Oil & Gas
 +
* Estimated Reserves:
 +
* Production Volume:
  
Operator: GDF Suez
+
=== Description ===
Country: Norway
+
* Gjøa was discovered in 1989. It is a combined oil and gas field located off the coast of the Norwegian city of Florø.
Location: off the coast of the city of Florø
+
* Statoil (owner of 20 %) is the operator in the field development phase, while Gaz de France (30 %) will be the operator. The other partners are Petoro (30 %), AS Norske Shell (12 %), RWE Dea Norge AS (8 %).
Production start: 2010
+
* The. Camilla, Belinda and Fram B fields (known as CBB and operated by Hydro) will be connected to the Gjøa semisubmersible platform by a common flowline subsea tie-back solution.
Partners: Wintershall, Okea 12%
+
* Gas from the Gjoa platform will be exported to Scotland via the British pipeline Flags, while the oil will be transported in the [[Troll Oil Pipeline | Troll Pipeline II]] to Statoil's [[Mongstad Refinery]] near Bergen, Norway.
Type: Oil & Gas
+
* The Gjøa production facilities topsides measures 110 meters long and 85 meters wide and weighs in just below the 20.000 tonnes mark. The hull weighs 14.200 tonnes.
Estimated Reserves:
+
* The [[Vega Gas and Condensate Field]] is tied back to Gjoa
Production Volume:
+
* The Gjøa P1 segment is located in the northern part of the field and is tied back to the existing infrastructure via a 5 km oil pipeline and a 2 km gas pipeline. The project is a two-well development with one oil and one gas producer.
Description
+
* Duva was developed as a subsea installation with three oil producers and one gas producer in a tie-back to Gjøa. The field is operated from the Gjøa semi-submersible platform via a dedicated umbilical.
  
Gjøa was discovered in 1989. It is a combined oil and gas field located off the coast of the Norwegian city of Florø.
+
==== Nova ====
Statoil (owner of 20 %) is the operator in the field development phase, while Gaz de France (30 %) will be the operator. The other partners are Petoro (30 %), AS Norske Shell (12 %), RWE Dea Norge AS (8 %).
+
* Nova is located in the Norwegian North Sea, about 120 kilometres northwest of Bergen and approximately 17 kilometres southwest of Gjøa. The water depth is roughly 370 metres. The Nova field consists of two subsea templates, one with three oil producers and one with three water injectors, tied back to the Gjøa platform.
The. Camilla, Belinda and Fram B fields (known as CBB and operated by Hydro) will be connected to the Gjøa semisubmersible platform by a common flowline subsea tie-back solution.
+
* The expected recoverable gross reserves from the field are estimated at 90 million barrels of oil equivalent (boe), of which the majority will be oil.
Gas from the Gjoa platform will be exported to Scotland via the British pipeline Flags, while the oil will be transported in the Troll II pipeline to Statoil's Mongstad refinery near Bergen, Norway.
 
The Gjøa production facilities topsides measures 110 meters long and 85 meters wide and weighs in just below the 20.000 tonnes mark. The hull weighs 14.200 tonnes.
 
The Vega Gas And Condensate Field is tied back to Gjoa
 
Contractors
 
  
Samsung Heavy: Semi-submersible hull construction
+
=== Contractors ===
Technip: Fabrication and installation of the infield pipelines
 
Aker Kvaerner:
 
Manufacture and supply of 16 kilometres of dynamic and static umbilicals
 
Detail design of topside and hull, procurement, construction and hook-up of topside, and mating of topside and hull
 
Saipem: Pipeline Installation of Gjoa Export Pipelines
 
Dresser-Rand: Provision of three centrifugal compressor trains driven by variable speed electric motors, and one DATUM compressor package driven by a gas turbine
 
ABB: Building a 98-kilometer underwater link from Mongstad
 
History
 
  
1989 - Gjøa was discovered
+
* **Samsung Heavy:** Semi-submersible hull construction
2006 - Statoil and Aker Kvaerner signed a MOU for the contract for the semisubmersible platform
+
* **Technip:** Fabrication and installation of the infield pipelines
2007 - Gjoa umbilicals contract awarded to Aker Kvaerner
+
* **Aker Kvaerner:**
2007 - Aker Kvaerner awarded floater installation contract
+
** Manufacture and supply of  16 kilometres of dynamic and static umbilicals
2007 - ABB awarded subsea cable contract
+
** Detail design of topside and hull, procurement, construction and hook-up of topside, and mating of topside and hull
2010 - Production started
+
* **Saipem:** Pipeline Installation of Gjoa Export Pipelines
2013 - Statoil reduced its stake to 5%
+
* **Dresser-Rand:** Provision of three centrifugal compressor trains driven by variable speed electric motors, and one DATUM compressor package driven by a gas turbine
2014 - Statoil sold its stake to Wintershall
+
* **ABB:** Building a 98-kilometer underwater link from Mongstad
2018 - Okea acquires Shell's stake
 
Geology
 
  
The reservoir contains gas above a relatively thin oil zone in Jurassic sandstones in the Viking, Brent and Dunlin Groups. The field comprises several tilted fault segments with partly uncertain communication and variable reservoir quality. The reservoir depth is about 2 200 metres.
+
=== History ===
 +
* 1989 - Gjøa was discovered
 +
* 2006 - Statoil and Aker Kvaerner signed a MOU for the contract for the semisubmersible platform
 +
* 2007 - Gjoa umbilicals contract awarded to Aker Kvaerner
 +
* 2007 - Aker Kvaerner awarded floater installation contract
 +
* 2007 - ABB awarded subsea cable contract
 +
* 2010 - Production started
 +
* 2013 - Statoil reduced its stake to 5%
 +
* 2014 - Statoil sold its stake to Wintershall
 +
* 2018 - Okea acquires Shell's stake
 +
* 2021 - Gjøa P1 starts production
 +
* 2021 - Sval Enerji acquires Edison Norge and increases its stake in Nova
 +
* 2022 - Nova field began operating
 +
* 2023 - ENI agrees to acquire Neptune
 +
 
 +
=== Geology ===
 +
* The reservoir contains gas above a relatively thin oil zone in Jurassic sandstones in the Viking, Brent and Dunlin Groups. The field comprises several tilted fault segments with partly uncertain communication and variable reservoir quality. The reservoir depth is about 2 200 metres.
  
 
=== Links ===
 
=== Links ===
NPD, Gjoa
+
# [http://www.npd.no/en/Publications/Facts/Facts-2013/Chapter-10/Gjoa/ NPD, Gjoa]
International Protective Coatings Platform References
+
# [[International Protective Coatings Platform References]]
Samsung Platform References
+
# [[Leirvik Living quarters and extensions References]]
Saipem Europe Pipeline References
+
# [[Samsung Platform References]]
Gjøa semisubmersible platform to Aker Kvaerner
+
# [[Saipem Europe Pipeline References]]
Gjoa umbilicals contract to Aker Kvaerner
+
# [http://killajoules.wikidot.com/archive:gjoa-semisubmersible-platform-to-aker-kvaerner Gjøa semisubmersible platform to Aker Kvaerner]
Aker Kvaerner awarded another floater installation contract
+
# [http://killajoules.wikidot.com/archive:gjoa-umbilicals-contract-to-aker-kvaerner Gjoa umbilicals contract to Aker Kvaerner]
Dresser-Rand Selected to Provide Equipment for Gjoa Offshore Project
+
# [http://killajoules.wikidot.com/archive:aker-kvaerner-awarded-another-floater-installation-c Aker Kvaerner awarded another floater installation contract]
Technip awarded contract by statoil for installation of Gjøa infield pipelines in Norway
+
# [http://killajoules.wikidot.com/archive:dresser-rand-selected-to-provide-equipment-for-gjoa Dresser-Rand Selected to Provide Equipment for Gjoa Offshore Project]
ABB wins $72-million order for oil-platform cable
+
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-by-statoil-for-installation Technip awarded contract by statoil for installation of Gjøa infield pipelines in Norway]
Gjøa comes on stream
+
# [http://killajoules.wikidot.com/archive:abb-wins-72-million-order-for-oil-platform-cable ABB wins $72-million order for oil-platform cable]
GDF SUEZ takes over operatorship of the Norwegian gas & oil field Gjøa
+
# [http://killajoules.wikidot.com/archive:gjoa-comes-on-stream Gjøa comes on stream]
Transaction to realise value and secure long-term growth on the NCS
+
# [http://killajoules.wikidot.com/archive:gdf-suez-takes-over-operatorship-of-the-norwegian-ga GDF SUEZ takes over operatorship of the Norwegian gas & oil field Gjøa]
Transaction with Wintershall on Norwegian continental shelf now completed
+
# [http://killajoules.wikidot.com/blog:3291 Transaction to realise value and secure long-term growth on the NCS]
Realising value to further strengthen NCS portfolio
+
# [http://killajoules.wikidot.com/blog:4414 Transaction with Wintershall on Norwegian continental shelf now completed]
Shell to sell Draugen and Gjøa interests to OKEA AS
+
# [http://killajoules.wikidot.com/blog:5436 Realising value to further strengthen NCS portfolio]
 +
# [https://abarrelfull.blogspot.com/2022/09/neptune-energy-completes-acquisition-of.html Neptune Energy completes the acquisition of ENGIE E&P International SA]
 +
# [http://killajoules.wikidot.com/archive:shell-to-sell-draugen-and-gjoa-interests-to-okea-as Shell to sell Draugen and Gjøa interests to OKEA AS]
 
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-substantial.html TechnipFMC Awarded a Substantial Integrated EPCI (iEPCI™) Contract for the Neptune Energy Duva and Gjøa P1 Projects]
 
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-substantial.html TechnipFMC Awarded a Substantial Integrated EPCI (iEPCI™) Contract for the Neptune Energy Duva and Gjøa P1 Projects]
 +
# [https://abarrelfull.blogspot.com/2023/01/gja-p1-starts-production.html Gjøa P1 starts production]
 +
# [https://abarrelfull.blogspot.com/2023/08/sval-energi-closes-acquisition-of.html Sval Energi closes acquisition of Edison Norge]
 +
# [https://a-barrel-full.blogspot.com/2022/09/nova-1st-oil-wintershall-dea-increases.html Nova 1st oil: Wintershall Dea increases production volumes in Norway]
 +
# [https://a-barrel-full.blogspot.com/2023/06/eni-and-var-energi-to-acquire-neptune.html Eni and Vår Energi to acquire Neptune, a leading independent exploration and production company with low emission, gas-oriented operations in Western Europe, North Africa, Indonesia and Australia]
 +
 +
[[category:Field]]
 +
[[category:Norway]]
 +
[[category:Neptune]]

Latest revision as of 18:01, 15 February 2024

Summary Information

  • Operator: Neptune Energy
  • Country: Norway
  • Location: off the coast of the city of Florø
  • Production start: 2010
  • Partners: Wintershall, Okea 12%
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Gjøa was discovered in 1989. It is a combined oil and gas field located off the coast of the Norwegian city of Florø.
  • Statoil (owner of 20 %) is the operator in the field development phase, while Gaz de France (30 %) will be the operator. The other partners are Petoro (30 %), AS Norske Shell (12 %), RWE Dea Norge AS (8 %).
  • The. Camilla, Belinda and Fram B fields (known as CBB and operated by Hydro) will be connected to the Gjøa semisubmersible platform by a common flowline subsea tie-back solution.
  • Gas from the Gjoa platform will be exported to Scotland via the British pipeline Flags, while the oil will be transported in the Troll Pipeline II to Statoil's Mongstad Refinery near Bergen, Norway.
  • The Gjøa production facilities topsides measures 110 meters long and 85 meters wide and weighs in just below the 20.000 tonnes mark. The hull weighs 14.200 tonnes.
  • The Vega Gas and Condensate Field is tied back to Gjoa
  • The Gjøa P1 segment is located in the northern part of the field and is tied back to the existing infrastructure via a 5 km oil pipeline and a 2 km gas pipeline. The project is a two-well development with one oil and one gas producer.
  • Duva was developed as a subsea installation with three oil producers and one gas producer in a tie-back to Gjøa. The field is operated from the Gjøa semi-submersible platform via a dedicated umbilical.

Nova

  • Nova is located in the Norwegian North Sea, about 120 kilometres northwest of Bergen and approximately 17 kilometres southwest of Gjøa. The water depth is roughly 370 metres. The Nova field consists of two subsea templates, one with three oil producers and one with three water injectors, tied back to the Gjøa platform.
  • The expected recoverable gross reserves from the field are estimated at 90 million barrels of oil equivalent (boe), of which the majority will be oil.

Contractors

  • **Samsung Heavy:** Semi-submersible hull construction
  • **Technip:** Fabrication and installation of the infield pipelines
  • **Aker Kvaerner:**
    • Manufacture and supply of 16 kilometres of dynamic and static umbilicals
    • Detail design of topside and hull, procurement, construction and hook-up of topside, and mating of topside and hull
  • **Saipem:** Pipeline Installation of Gjoa Export Pipelines
  • **Dresser-Rand:** Provision of three centrifugal compressor trains driven by variable speed electric motors, and one DATUM compressor package driven by a gas turbine
  • **ABB:** Building a 98-kilometer underwater link from Mongstad

History

  • 1989 - Gjøa was discovered
  • 2006 - Statoil and Aker Kvaerner signed a MOU for the contract for the semisubmersible platform
  • 2007 - Gjoa umbilicals contract awarded to Aker Kvaerner
  • 2007 - Aker Kvaerner awarded floater installation contract
  • 2007 - ABB awarded subsea cable contract
  • 2010 - Production started
  • 2013 - Statoil reduced its stake to 5%
  • 2014 - Statoil sold its stake to Wintershall
  • 2018 - Okea acquires Shell's stake
  • 2021 - Gjøa P1 starts production
  • 2021 - Sval Enerji acquires Edison Norge and increases its stake in Nova
  • 2022 - Nova field began operating
  • 2023 - ENI agrees to acquire Neptune

Geology

  • The reservoir contains gas above a relatively thin oil zone in Jurassic sandstones in the Viking, Brent and Dunlin Groups. The field comprises several tilted fault segments with partly uncertain communication and variable reservoir quality. The reservoir depth is about 2 200 metres.

Links

  1. NPD, Gjoa
  2. International Protective Coatings Platform References
  3. Leirvik Living quarters and extensions References
  4. Samsung Platform References
  5. Saipem Europe Pipeline References
  6. Gjøa semisubmersible platform to Aker Kvaerner
  7. Gjoa umbilicals contract to Aker Kvaerner
  8. Aker Kvaerner awarded another floater installation contract
  9. Dresser-Rand Selected to Provide Equipment for Gjoa Offshore Project
  10. Technip awarded contract by statoil for installation of Gjøa infield pipelines in Norway
  11. ABB wins $72-million order for oil-platform cable
  12. Gjøa comes on stream
  13. GDF SUEZ takes over operatorship of the Norwegian gas & oil field Gjøa
  14. Transaction to realise value and secure long-term growth on the NCS
  15. Transaction with Wintershall on Norwegian continental shelf now completed
  16. Realising value to further strengthen NCS portfolio
  17. Neptune Energy completes the acquisition of ENGIE E&P International SA
  18. Shell to sell Draugen and Gjøa interests to OKEA AS
  19. TechnipFMC Awarded a Substantial Integrated EPCI (iEPCI™) Contract for the Neptune Energy Duva and Gjøa P1 Projects
  20. Gjøa P1 starts production
  21. Sval Energi closes acquisition of Edison Norge
  22. Nova 1st oil: Wintershall Dea increases production volumes in Norway
  23. Eni and Vår Energi to acquire Neptune, a leading independent exploration and production company with low emission, gas-oriented operations in Western Europe, North Africa, Indonesia and Australia