Difference between revisions of "Garagol Deniz West Gas Field"

From A Barrel Full
Jump to navigation Jump to search
Line 2: Line 2:
 
* Operator: Petronas
 
* Operator: Petronas
 
* Country: Turkmenistan
 
* Country: Turkmenistan
* Location:  
+
* Location: Caspian Sea
 
* Production start: 2021
 
* Production start: 2021
 
* Partners:  
 
* Partners:  
Line 10: Line 10:
  
 
=== Description ===
 
=== Description ===
 +
* The Garagol Deniz West field is located around 75km offshore of Turkmenistan in the Caspian Sea.
 
* The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant.  
 
* The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant.  
  

Revision as of 09:43, 22 February 2024

Summary Information

  • Operator: Petronas
  • Country: Turkmenistan
  • Location: Caspian Sea
  • Production start: 2021
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Garagol Deniz West field is located around 75km offshore of Turkmenistan in the Caspian Sea.
  • The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant.

Contractors

  • Ilk Insaat: EPCC of Offshore Platform
  • Serimax: Pipeline from the platform to the processing facility

History

  • 2021 - First gas produced

Geology

Links

  1. Ilk Insaat, Project page
  2. Serimax Pipeline References