Garagol Deniz West Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Petronas
- Country: Turkmenistan
- Location: Caspian Sea
- Production start: 2021
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Garagol Deniz West field is located around 75km offshore of Turkmenistan in the Caspian Sea.
- The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant.
- The platform has capacity of 10.000 bpd oil and 35 mmscfd gas and is located in 35 m water depth.
Contractors
- Ilk Insaat: EPCC of Offshore Platform
- Serimax: Pipeline from the platform to the processing facility
History
- 2021 - First gas produced