Garagol Deniz West Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Petronas
  • Country: Turkmenistan
  • Location: Caspian Sea
  • Production start: 2021
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Garagol Deniz West field is located around 75km offshore of Turkmenistan in the Caspian Sea.
  • The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant.
  • The platform has capacity of 10.000 bpd oil and 35 mmscfd gas and is located in 35 m water depth.

Contractors

  • Ilk Insaat: EPCC of Offshore Platform
  • Serimax: Pipeline from the platform to the processing facility

History

  • 2021 - First gas produced

Geology

Links

  1. Ilk Insaat Platform References
  2. Serimax Pipeline References