Difference between revisions of "Garagol Deniz West Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 23: | Line 23: | ||
=== Links === | === Links === | ||
+ | # [http://www.ilkconstruction.com/project/garagol-deniz-west-offshore-platform-project.html Ilk Insaat, Project page] | ||
# [[Serimax Pipeline References]] | # [[Serimax Pipeline References]] | ||
Revision as of 09:38, 22 February 2024
Summary Information
- Operator: Petronas
- Country: Turkmenistan
- Location:
- Production start: 2021
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant.
Contractors
- Ilk Insaat: EPCC of Offshore Platform
- Serimax: Pipeline from the platform to the processing facility
History
- 2021 - First gas produced