Difference between revisions of "Garagol Deniz West Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Petronas * Country: Turkmenistan * Location: * Production start: 2021 * Partners: * Type: Gas * Estimated Reserves: * Production Vol...") |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * | + | * The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant. |
=== Contractors === | === Contractors === | ||
− | * | + | * '''Ilk Insaat:''' EPCC of Offshore Platform |
+ | * '''Serimax:''' Pipeline from the platform to the processing facility | ||
=== History === | === History === | ||
− | * | + | * 2021 - First gas produced |
=== Geology === | === Geology === | ||
Line 22: | Line 23: | ||
=== Links === | === Links === | ||
− | # | + | # [[Serimax Pipeline References]] |
Revision as of 09:37, 22 February 2024
Summary Information
- Operator: Petronas
- Country: Turkmenistan
- Location:
- Production start: 2021
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant.
Contractors
- Ilk Insaat: EPCC of Offshore Platform
- Serimax: Pipeline from the platform to the processing facility
History
- 2021 - First gas produced