+++ Summary Information

  • Operator: Total
  • Country: UK
  • Location: North Sea
  • Production start: 2009
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume: 60,000 bpde

+++ Description

  • The Elgin and Franklin fields started producing in 2001 and account for 7% of the UK’s production. These are high pressure high temperature fields whose exploitation requires strong technological expertise.
  • Both fields have their own wellhead platform with production from the fields being processed through one central facility –- a production/utilities/quarters (PUQ) platform located on the Elgin field
  • At the time of development, the Elgin/Franklin project constitutes the largest high-pressure/high-temperature development in the world (particularly high pressures of 1,100 bars and temperatures of 200° centigrade) and the deepest reservoirs ever put into production in the North Sea (approximately 5,500 meters).
  • Gas is transported by the [[[Shearwater-Elgin Area Line (SEAL) Gas Pipeline]]] to the [[[Bacton Gas Plant]]]
  • Liquid condensate from the fields is transported to shore via the existing [[[Forties Pipeline System]]] and on to Kinneil for processing

+++ Contractors

  • **Barmac:** Elgin Platform Construction
  • **Rosetti Marino:** Engineering, Procurement, Construction, Installation, Hook-up and Commissioning of Topsides for the Elgin B platform
  • **Saipem:**
* Wellhead Jacket Installation - EPIC
* Elgin / Franklin Trenching
  • **ETPM:** Liquids & Gas Export Pipelines
  • **FoundOcean:** Elgin B Grouting
  • **Bifab:** Riser Caisson
  • **J P Kenny:** Conceptual design study
  • **Nessco:** Communication systems

++++ West Franklin

  • **Saipem:** Wellhead Platform Jacket - EPIC
  • **Rosetti Marino:** Engineering, Procurement, Construction, Installation, Hook-up and Commissioning of Topsides for the West Franklin Platform
  • **KWSubsea:** Engineering support for the umbilical detailed design documentation


+++ History

  • 1997 - Approval received for development
  • 2001 - First gas produced
  • 2002 - BG acquire 1.76% from BP
  • 2003 - West Franklin discovered
  • 2007 - Phase 1 of West Franklin started
  • 2009 - Started production
  • 2011 - Total acquired GDF SUEZ interest in Elgin Franklin
  • 2012 - Gas leak incident at Elgin platform
  • 2013 - Production resumes at the field
  • 2015 - Production starts at West Franklin Phase 2
  • 2016 - Premier Oil acquired EON's share
  • 2021 - Exxon sells its stake to HitecVision

+++ Geology

+++ Links

  1. [[[Saipem Fixed Offshore Production Facilities Project References]]]
  2. [[[Saipem Europe Pipeline References]]]
  3. [[[FoundOcean Subsea References]]]
  4. [[[KWSubsea Subsea References]]]
  5. [[[Nessco Platform References]]]
  6. [[[J P Kenny Subsea References]]]
  7. [[[Serimax Pipeline References]]]
  8. [[[Rosetti Marino Platform References]]]
  9. TotalFinaElf announces first production from Elgin/Franklin in UK North Sea
  10. First production from the Franklin Field in the North Sea
  11. ARCO, Partners Receive Go-Ahead for Shearwater, Elgin/Franklin Projects in UK Central North Sea
  12. BP and BG agree North Sea asset swap
  13. UK: Total to acquire GDF SUEZ interest in Elgin Franklin
  14. Status on UK – Gas leak incident at Elgin platform in the North Sea
  15. United Kingdom: Total resumes production from the Elgin/Franklin area in the UK North Sea
  16. UK: West Franklin Phase 2 brought on stream in the North Sea
  17. Acquisition of UK North Sea Assets from E.ON
  18. ExxonMobil to sell U.K. upstream central and northern North Sea assets