* Nelson Complexity:  
 
* Nelson Complexity:  
 
* Project Stage: Under construction
 
* Project Stage: Under construction
* Expected Completion:  
+
* Expected Completion: 2022
* Budget:
+
* Budget: $900 million
  
 
=== The Project ===
 
=== The Project ===
Line 20: Line 20:
 
** The project, aims to expand the refinery’s crude processing capacity and to increase refining depth
 
** The project, aims to expand the refinery’s crude processing capacity and to increase refining depth
 
** It will produce ultra-low sulfur diesel and gasoline (diesel + 1,200,000 m3/year and gasoline + 650,000 m3/year)
 
** It will produce ultra-low sulfur diesel and gasoline (diesel + 1,200,000 m3/year and gasoline + 650,000 m3/year)
 +
** Phase II includes a new preheating train to the primary distillation unit, replacing the reformer’s fired heater, catalytic cracker revamp, replacing the two coke drums, conversion of diesel hydrotreater unit into a naphtha hydrotreater
 
* Main Contractors:
 
* Main Contractors:
 
** Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer
 
** Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer
 +
** PROSERNAT: Modular supply of a complete Sulphur Block including Fuel Gas Treating Unit, Amine Regeneration Unit, double stage Sour Water Stripper Unit, Claus Unit, Tail Gas treatment Unit
 
* Licences:  
 
* Licences:  
 
**
 
**
Line 40: Line 42:
  
 
=== Crude Supply ===
 
=== Crude Supply ===
 +
* The additional crude required by the refinery as a result of the expansion will be supplied by pipeline, requiring an expansion of the main pipeline
  
* -
 
 
=== Products Produced ===
 
=== Products Produced ===
 +
* The refinery will produce much greater quantities of ULSD and Gasoline
  
*
 
 
=== History ===
 
=== History ===
*  
+
* 2016 - IFC awarded the first loan
 +
* 2017 - Hytec awarded basic engineering contract
 +
* 2019 - IFC awarded the second loan
  
 
=== Other Information ===
 
=== Other Information ===
Line 62: Line 66:
  
 
[[category:Refinery]]
 
[[category:Refinery]]
 +
[[Category:Argentina]]

Latest revision as of 10:11, 31 March 2020

Summary Information

The Project

  • Project Type: Expansion and upgrade
  • Project Summary:
    • The project, aims to expand the refinery’s crude processing capacity and to increase refining depth
    • It will produce ultra-low sulfur diesel and gasoline (diesel + 1,200,000 m3/year and gasoline + 650,000 m3/year)
    • Phase II includes a new preheating train to the primary distillation unit, replacing the reformer’s fired heater, catalytic cracker revamp, replacing the two coke drums, conversion of diesel hydrotreater unit into a naphtha hydrotreater
  • Main Contractors:
    • Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer
    • PROSERNAT: Modular supply of a complete Sulphur Block including Fuel Gas Treating Unit, Amine Regeneration Unit, double stage Sour Water Stripper Unit, Claus Unit, Tail Gas treatment Unit
  • Licences:

Refining Units

  • Crude unit - revamp
  • Reformer - revamp
  • Naphtha and Diesel hydrotreaters
  • Delayed coker
  • Sulfur recovery unit
  • Sour water stripper
  • Sour gas scrubbers
  • Amine regeneration system

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The additional crude required by the refinery as a result of the expansion will be supplied by pipeline, requiring an expansion of the main pipeline

Products Produced

  • The refinery will produce much greater quantities of ULSD and Gasoline

History

  • 2016 - IFC awarded the first loan
  • 2017 - Hytec awarded basic engineering contract
  • 2019 - IFC awarded the second loan

Other Information

  • IFC has made two loans for the project
    • US$135 million of a US$500 million package in 2019
    • US$78 million of a US$378 million package in 2016

Links

  1. Hytech Downstream References
  2. Axion Energy awards Hytech a Basic and Detailed Engineering contract to develop the revamp of the Campana Refinery Powerformer and Atmospheric Distillation
  3. IFC project summary
  4. IFC helps Argentina meet energy needs with $378 million in long term loans to Axion Energy
  5. IFC helps Argentina meet energy needs with $500 million loan to Pan American Energy