=== Summary Information ===
 
 
 
=== Summary Information ===
 
=== Summary Information ===
 
* Ownership: Axion Energy / Pan American Energy
 
* Ownership: Axion Energy / Pan American Energy
Line 8: Line 6:
 
* Wiki Page: [[Axion Campana Refinery]]
 
* Wiki Page: [[Axion Campana Refinery]]
 
* Location:   
 
* Location:   
* Capacity:  million tons/annum & bbl/day  
+
* Capacity:   
 +
** Before: 4.5 million tons/annum & 90,000 bbl/day
 +
** After: 6.0 million tons/annum & 120,000 bbl/day
 
* Nelson Complexity:  
 
* Nelson Complexity:  
* Project Stage:
+
* Project Stage: Under construction
* Expected Completion:  
+
* Expected Completion: 2022
* Budget:
+
* Budget: $900 million
  
 
=== The Project ===
 
=== The Project ===
Line 18: Line 18:
 
* Project Type: Expansion and upgrade
 
* Project Type: Expansion and upgrade
 
* Project Summary:  
 
* Project Summary:  
**  
+
** The project, aims to expand the refinery’s crude processing capacity and to increase refining depth
 +
** It will produce ultra-low sulfur diesel and gasoline (diesel + 1,200,000 m3/year and gasoline + 650,000 m3/year)
 +
** Phase II includes a new preheating train to the primary distillation unit, replacing the reformer’s fired heater, catalytic cracker revamp, replacing the two coke drums, conversion of diesel hydrotreater unit into a naphtha hydrotreater
 
* Main Contractors:
 
* Main Contractors:
 
** Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer
 
** Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer
 +
** PROSERNAT: Modular supply of a complete Sulphur Block including Fuel Gas Treating Unit, Amine Regeneration Unit, double stage Sour Water Stripper Unit, Claus Unit, Tail Gas treatment Unit
 
* Licences:  
 
* Licences:  
 
**
 
**
  
 
=== Refining Units ===
 
=== Refining Units ===
*  
+
* Crude unit - revamp
 +
* Reformer - revamp
 +
* Naphtha and Diesel hydrotreaters
 +
* Delayed coker
 +
* Sulfur recovery unit
 +
* Sour water stripper
 +
* Sour gas scrubbers
 +
* Amine regeneration system
  
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
Line 32: Line 42:
  
 
=== Crude Supply ===
 
=== Crude Supply ===
 +
* The additional crude required by the refinery as a result of the expansion will be supplied by pipeline, requiring an expansion of the main pipeline
  
* -
 
 
=== Products Produced ===
 
=== Products Produced ===
 +
* The refinery will produce much greater quantities of ULSD and Gasoline
  
*
 
 
=== History ===
 
=== History ===
*  
+
* 2016 - IFC awarded the first loan
 +
* 2017 - Hytec awarded basic engineering contract
 +
* 2019 - IFC awarded the second loan
  
 
=== Other Information ===
 
=== Other Information ===
  
* -
+
* IFC has made two loans for the project
 
+
** US$135 million of a US$500 million package in 2019
 +
** US$78 million of a US$378 million package in 2016
  
 
=== Links ===
 
=== Links ===
 +
# [[Hytech Downstream References]]
 
# [http://killajoules.wikidot.com/archive:axion-energy-awards-hytech-a-basic-and-detailed-engi Axion Energy awards Hytech a Basic and Detailed Engineering contract to develop the revamp of the Campana Refinery Powerformer and Atmospheric Distillation]
 
# [http://killajoules.wikidot.com/archive:axion-energy-awards-hytech-a-basic-and-detailed-engi Axion Energy awards Hytech a Basic and Detailed Engineering contract to develop the revamp of the Campana Refinery Powerformer and Atmospheric Distillation]
 +
# [https://disclosures.ifc.org/#/projectDetail/ESRS/36221 IFC project summary]
 +
# [http://killajoules.wikidot.com/archive:ifc-helps-argentina-meet-energy-needs-with-378-milli IFC helps Argentina meet energy needs with $378 million in long term loans to Axion Energy]
 +
# [http://killajoules.wikidot.com/archive:ifc-helps-argentina-meet-energy-needs-with-500-milli IFC helps Argentina meet energy needs with $500 million loan to Pan American Energy]
  
 
[[category:Refinery]]
 
[[category:Refinery]]
 +
[[Category:Argentina]]

Latest revision as of 10:11, 31 March 2020

Summary Information

The Project

  • Project Type: Expansion and upgrade
  • Project Summary:
    • The project, aims to expand the refinery’s crude processing capacity and to increase refining depth
    • It will produce ultra-low sulfur diesel and gasoline (diesel + 1,200,000 m3/year and gasoline + 650,000 m3/year)
    • Phase II includes a new preheating train to the primary distillation unit, replacing the reformer’s fired heater, catalytic cracker revamp, replacing the two coke drums, conversion of diesel hydrotreater unit into a naphtha hydrotreater
  • Main Contractors:
    • Hytech: Basic and Detailed Engineering for revamp of Crude Unit and Reformer
    • PROSERNAT: Modular supply of a complete Sulphur Block including Fuel Gas Treating Unit, Amine Regeneration Unit, double stage Sour Water Stripper Unit, Claus Unit, Tail Gas treatment Unit
  • Licences:

Refining Units

  • Crude unit - revamp
  • Reformer - revamp
  • Naphtha and Diesel hydrotreaters
  • Delayed coker
  • Sulfur recovery unit
  • Sour water stripper
  • Sour gas scrubbers
  • Amine regeneration system

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The additional crude required by the refinery as a result of the expansion will be supplied by pipeline, requiring an expansion of the main pipeline

Products Produced

  • The refinery will produce much greater quantities of ULSD and Gasoline

History

  • 2016 - IFC awarded the first loan
  • 2017 - Hytec awarded basic engineering contract
  • 2019 - IFC awarded the second loan

Other Information

  • IFC has made two loans for the project
    • US$135 million of a US$500 million package in 2019
    • US$78 million of a US$378 million package in 2016

Links

  1. Hytech Downstream References
  2. Axion Energy awards Hytech a Basic and Detailed Engineering contract to develop the revamp of the Campana Refinery Powerformer and Atmospheric Distillation
  3. IFC project summary
  4. IFC helps Argentina meet energy needs with $378 million in long term loans to Axion Energy
  5. IFC helps Argentina meet energy needs with $500 million loan to Pan American Energy