(Created page with "Summary Information * Source: * Destination: Eunice NGL fractionation facilities in south central Louisiana * Ownership: Crosstex Energy * Website: http://www.crosstexenergy...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Source:  
 
* Source:  
Line 5: Line 5:
 
* Ownership: Crosstex Energy
 
* Ownership: Crosstex Energy
 
* Website: http://www.crosstexenergy.com/
 
* Website: http://www.crosstexenergy.com/
* Length:  kilometres (440 miles)  
+
* Length:  kilometres (570 miles)  
* Capacity: barrels of oil per day  
+
* Capacity: 120,000 barrels of oil per day  
 
* Crude Type: NGL
 
* Crude Type: NGL
  
+++ Brief Description
+
=== Brief Description ===
  
* The 440-mile Cajun Sibon NGL pipeline is connected to its Eunice NGL fractionation facilities in south-central Louisiana.
+
* The Cajun Sibon NGL pipeline connects NGL fractionators in Plaquemine, Riverside and Eunice to processing plants across Texas and Louisiana
 +
* The first extension connects the Eunice NGL fractionation facility in south central Louisiana to Mont Belvieu supply pipelines in East Texas.
 +
** A 130-mile, 12-inch-diameter pipeline, it has capacity of 70,000 barrels per day of raw-make NGL
 +
* A Second expansion increased pipeline capacity by an additional 50,000 barrels per day of raw-make NGL. its also involved:
 +
** the installation of a 100,000-barrel-per-day fractionator adjacent to the Partnership’s Plaquemine natural gas processing plant; the modification of the Riverside fractionator facility;
 +
** the construction of a 32 mile extension of LIG’s Bayou Jack Lateral that will provide gas services to customers in the Mississippi River corridor;
 +
** the installation of four pump stations totaling 13,400 horsepower and the construction of 57 miles of NGL pipelines that will originate at the Partnership’s Eunice fractionator and connect to the new Plaquemine fractionator.
  
+++ Pipeline Status
 
* In operation, but is being expanded in two phases
 
* **Phase I includes:**
 
* A 130-mile, 12-inch-diameter pipeline that will extend the Partnership’s existing 440-mile Cajun-Sibon NGL pipeline system, connecting its Eunice NGL fractionation facility in south central Louisiana to Mont Belvieu supply pipelines in East Texas. The pipeline will have an initial capacity of 70,000 barrels per day of raw-make NGL.
 
* **Phase II will include the following:**
 
*  the expansion of the Partnership’s Cajun-Sibon pipeline capacity by an additional 50,000 barrels per day of raw-make NGL for a total project capacity of 120,000 barrels per day;
 
* the installation of a 100,000-barrel-per-day fractionator adjacent to the Partnership’s Plaquemine natural gas processing plant; the modification of the Riverside fractionator facility;
 
* the construction of a 32 mile extension of LIG’s Bayou Jack Lateral that will provide gas services to customers in the Mississippi River corridor;
 
* the installation of four pump stations totaling 13,400 horsepower and the construction of 57 miles of NGL pipelines that will originate at the Partnership’s Eunice fractionator and connect to the new Plaquemine fractionator.
 
* Phase II is expected to be completed in the second half of 2014,
 
  
 +
=== Pipeline Status ===
 +
* In operation
 
+++ History
 
+++ History
 
* 2011 - Crosstex Energy Announces Expansion Project
 
* 2011 - Crosstex Energy Announces Expansion Project
 
* 2012 - Crosstex Energy Announces Long-Term Supply Commitments for Cajun-Sibon Natural Gas Liquids Extension Project
 
* 2012 - Crosstex Energy Announces Long-Term Supply Commitments for Cajun-Sibon Natural Gas Liquids Extension Project
 
* 2012 - Crosstex Energy Initiates Phase II of Cajun-Sibon Natural Gas Liquids Pipeline Extension
 
* 2012 - Crosstex Energy Initiates Phase II of Cajun-Sibon Natural Gas Liquids Pipeline Extension
 +
* 2013 - Phase 1 expansion is completed
 +
* 2014 - Phase 2 expansion is completed
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
  
 +
# [[EIA Liquids Pipeline Projects 2010-2014]]
 
# [http://killajoules.wikidot.com/blog:3515 Crosstex Energy Initiates Phase II of Cajun-Sibon Natural Gas Liquids Pipeline Extension in Louisiana]
 
# [http://killajoules.wikidot.com/blog:3515 Crosstex Energy Initiates Phase II of Cajun-Sibon Natural Gas Liquids Pipeline Extension in Louisiana]
 
# [http://www.crosstexenergy.com/sites/default/files/pdfs/Estimated_Economic_Benefit_Cajun_Sibon_Expansion_Project.pdf Economic Impact of Cajun Sibon Expansion Project In Louisiana and Texas]
 
# [http://www.crosstexenergy.com/sites/default/files/pdfs/Estimated_Economic_Benefit_Cajun_Sibon_Expansion_Project.pdf Economic Impact of Cajun Sibon Expansion Project In Louisiana and Texas]

Latest revision as of 09:45, 4 October 2023

Summary Information

  • Source:
  • Destination: Eunice NGL fractionation facilities in south central Louisiana
  • Ownership: Crosstex Energy
  • Website: http://www.crosstexenergy.com/
  • Length: kilometres (570 miles)
  • Capacity: 120,000 barrels of oil per day
  • Crude Type: NGL

Brief Description

  • The Cajun Sibon NGL pipeline connects NGL fractionators in Plaquemine, Riverside and Eunice to processing plants across Texas and Louisiana
  • The first extension connects the Eunice NGL fractionation facility in south central Louisiana to Mont Belvieu supply pipelines in East Texas.
    • A 130-mile, 12-inch-diameter pipeline, it has capacity of 70,000 barrels per day of raw-make NGL
  • A Second expansion increased pipeline capacity by an additional 50,000 barrels per day of raw-make NGL. its also involved:
    • the installation of a 100,000-barrel-per-day fractionator adjacent to the Partnership’s Plaquemine natural gas processing plant; the modification of the Riverside fractionator facility;
    • the construction of a 32 mile extension of LIG’s Bayou Jack Lateral that will provide gas services to customers in the Mississippi River corridor;
    • the installation of four pump stations totaling 13,400 horsepower and the construction of 57 miles of NGL pipelines that will originate at the Partnership’s Eunice fractionator and connect to the new Plaquemine fractionator.


Pipeline Status

  • In operation

+++ History

  • 2011 - Crosstex Energy Announces Expansion Project
  • 2012 - Crosstex Energy Announces Long-Term Supply Commitments for Cajun-Sibon Natural Gas Liquids Extension Project
  • 2012 - Crosstex Energy Initiates Phase II of Cajun-Sibon Natural Gas Liquids Pipeline Extension
  • 2013 - Phase 1 expansion is completed
  • 2014 - Phase 2 expansion is completed

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2010-2014
  2. Crosstex Energy Initiates Phase II of Cajun-Sibon Natural Gas Liquids Pipeline Extension in Louisiana
  3. Economic Impact of Cajun Sibon Expansion Project In Louisiana and Texas
  4. Crosstex Energy Announces Natural Gas Liquids Pipeline, Fractionation Expansion Project in Louisiana
  5. Crosstex Energy Announces Long-Term Supply Commitments for Cajun-Sibon Natural Gas Liquids Extension Project
  6. Crosstex Energy Completes Long-Term Supply Contracts for Cajun-Sibon Natural Gas Liquids Pipeline Extension