Bukit Tua Oil and Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Petronas
- Country: Indonesia
- Location: 2.20 - Ketapang PSC
- Production start: Expected 2014
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Bukit Tua Field (Ketapang WK) is located in East Java, the north of Madura Island, having an area about 3.322 km2, and is about 100 km from Surabaya industry areas
- Production volumes are expected to be 50 MMSCFD of gas and 20.000 barrel per day of oil
- The field will utilise a wellhead platform and the [[[Bukit Tua FPSO]]]
+++ Contractors
- **McDermott:**
- BTJT-A Jacket Fabrication
- Transportation and installation of the BTJT-A jacket, its related topsides and subsea pipeline tie-in spools
- Pre-commissioning of the related export and infield pipelines
- **PT Timas Suplindo:** Pipeline installation
+++ History
- 1998 - PSC agreement signed
- 2012 - Bukit Tua South discovered
- 2014 - FPSO & Jacket contracts awarded
+++ Geology
+++ Links
- Indonesia Exploration And Production Blocks
- Serimax Asia Pipeline References
- Kepodang and Ketapang Field are Ready to Produce by 2014
- New Discoveries For Petronas In Malaysia And Indonesia
- McDermott Awarded Fast-Track Fabrication Contract in East Java, Indonesia
- Keppel secures two FPSO contracts worth S$190 million
- McDermott Awarded Second Contract for PETRONAS Bukit Tua Development in East Java, Indonesia