Difference between revisions of "BiFab Subsea References"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "# Ninian Oil Field #* BP / Chevron #* Ninian/Sullum Voe - Subsea Isolation Valve Spools and Protection Frame. #* 105 Tonnes. 20m x 12m x 6m # Ravenspurn North Gas Field...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 11: | Line 11: | ||
#* Forties/Artificial Lift - Flare Tie-Ins, Drain Systems and Compressor Pipework. Process Pipework in Stainless Steel, Carbon Steel and Low Temperature Carbon Steel | #* Forties/Artificial Lift - Flare Tie-Ins, Drain Systems and Compressor Pipework. Process Pipework in Stainless Steel, Carbon Steel and Low Temperature Carbon Steel | ||
# EMC/Occidental - Fabrication of Pipeline Flanges Spools to BS 4515. 20" and 16" Diameter | # EMC/Occidental - Fabrication of Pipeline Flanges Spools to BS 4515. 20" and 16" Diameter | ||
− | # [[Brae Complex Oil | + | # [[Brae Complex Oil and Gas Fields]] |
#* Marathon Oil UK Limited | #* Marathon Oil UK Limited | ||
#* East Brae | #* East Brae | ||
Line 37: | Line 37: | ||
#* Unity Platform Subsea Pipeline Tie-Ins | #* Unity Platform Subsea Pipeline Tie-Ins | ||
# FMC/Shell Nelson/Subsea EPC Contract 4 No. Wellheads Protection Covers and 1 No. Production Manifold and Protection Cover with Super Duplex Pipework. 4 x 65 Tonnes and 1 x 150 Tonnes | # FMC/Shell Nelson/Subsea EPC Contract 4 No. Wellheads Protection Covers and 1 No. Production Manifold and Protection Cover with Super Duplex Pipework. 4 x 65 Tonnes and 1 x 150 Tonnes | ||
− | # [[Brae Complex Oil | + | # [[Brae Complex Oil and Gas Fields]] |
#* United Kingdom | #* United Kingdom | ||
#* Marathon | #* Marathon | ||
#* Brae/Subsea: Pipeline Crossover, Protection Cover and Pipe Spools, Subsea Isolation Valve with Protection Cover | #* Brae/Subsea: Pipeline Crossover, Protection Cover and Pipe Spools, Subsea Isolation Valve with Protection Cover | ||
− | # [[Greater Alwyn Oil | + | # [[Greater Alwyn Oil and Gas Fields]] |
#* United Kingdom | #* United Kingdom | ||
#* Total Oil | #* Total Oil | ||
#* Dunbar-Ellon/Subsea Choke Manifold and Protection Cover | #* Dunbar-Ellon/Subsea Choke Manifold and Protection Cover | ||
#* 27 Tonne. 4m x 4m x 2.75m | #* 27 Tonne. 4m x 4m x 2.75m | ||
− | # Stena/Shell Brent South Development/Tie-In Spools Fabrication of Super Duplex Pipe Spool | + | # [[Brent Oil Field]] |
+ | #* Stena/Shell | ||
+ | #* Brent South Development/Tie-In Spools | ||
+ | #* Fabrication of Super Duplex Pipe Spool | ||
# [[Deborah Gas Field]] | # [[Deborah Gas Field]] | ||
#* United Kingdom | #* United Kingdom | ||
Line 53: | Line 56: | ||
#* Dawn/Deborah 2 No Wellhead Protection Structures – Dawn Weighing 45.1 Tonnes and Deborah 49.9 Tonnes | #* Dawn/Deborah 2 No Wellhead Protection Structures – Dawn Weighing 45.1 Tonnes and Deborah 49.9 Tonnes | ||
# BP Harding/TPG 500 Jack-Up Design and Fabricate Plem – Fabricate and Install 10" and 24" Oil Export Line Risers and Gravity Base Tank Distribution Pipework. Fabricate Platform Tie-Ins and Suction Anchors. Plem 60-70 Tonnes | # BP Harding/TPG 500 Jack-Up Design and Fabricate Plem – Fabricate and Install 10" and 24" Oil Export Line Risers and Gravity Base Tank Distribution Pipework. Fabricate Platform Tie-Ins and Suction Anchors. Plem 60-70 Tonnes | ||
− | # [[Erskine Oil | + | # [[Erskine Oil and Gas Field]] |
#* United Kingdom | #* United Kingdom | ||
#* Texaco | #* Texaco | ||
Line 70: | Line 73: | ||
# [[Mungo Oil Field]] & [[Marnock Oil Field]] | # [[Mungo Oil Field]] & [[Marnock Oil Field]] | ||
#* BP ETAP CATS, Mungo & Marnock Waterflood Subsea Manifolds & Protection Covers | #* BP ETAP CATS, Mungo & Marnock Waterflood Subsea Manifolds & Protection Covers | ||
− | # [[MacCulloch Oil | + | # [[MacCulloch Oil and Gas Field]] |
#* United Kingdom | #* United Kingdom | ||
#* NSP | #* NSP | ||
Line 96: | Line 99: | ||
#* Saipem | #* Saipem | ||
#* Buzzard PLEMs / Manifolds / Tie-In Spools | #* Buzzard PLEMs / Manifolds / Tie-In Spools | ||
− | # [[Bouri Oil | + | # [[Bouri Oil and Gas Field]] |
#* Libya | #* Libya | ||
#* AGIP | #* AGIP | ||
Line 116: | Line 119: | ||
#* Acergy | #* Acergy | ||
#* Hot Tap | #* Hot Tap | ||
− | # [[Skarv Oil | + | # [[Skarv Oil and Gas Field]] |
#* Norway | #* Norway | ||
#* BP | #* BP | ||
Line 122: | Line 125: | ||
#* 5 x Subsea Manifolds | #* 5 x Subsea Manifolds | ||
# VetcoGray Fisher / Tuna Manifolds / Coolers | # VetcoGray Fisher / Tuna Manifolds / Coolers | ||
− | # [[Skarv Oil | + | # [[Skarv Oil and Gas Field]] |
#* Norway | #* Norway | ||
#* BP | #* BP | ||
#* PLEM / ERB | #* PLEM / ERB |
Latest revision as of 06:32, 23 August 2023
- Ninian Oil Field
- BP / Chevron
- Ninian/Sullum Voe - Subsea Isolation Valve Spools and Protection Frame.
- 105 Tonnes. 20m x 12m x 6m
- Ravenspurn North Gas Field
- BP Petroleum
- Cleeton, Ravenspurn & Magnus/Subsea 3 Subsea Isolation Valve Spools and Protection Frames.
- 70 Tonnes. 16"-15.5m 8m x 5m, 24"-14m x 12.5m x 6m, 36"-18.75m x 95m x 6m
- Forties Oil Field
- Artificial Lift Consortium/BP
- Forties/Artificial Lift - Flare Tie-Ins, Drain Systems and Compressor Pipework. Process Pipework in Stainless Steel, Carbon Steel and Low Temperature Carbon Steel
- EMC/Occidental - Fabrication of Pipeline Flanges Spools to BS 4515. 20" and 16" Diameter
- Brae Complex Oil and Gas Fields
- Marathon Oil UK Limited
- East Brae
- Caisson Risers, Anchor and Clamps. 200 Tonnes. 140m long x 914mm diameter
- Forties Oil Field
- Artificial Lift Consortium/BP
- Water Injection Manifolds and Pipework
- Forties Oil Field
- Artificial Lift Consortium/BP
- Water Injection Pipework
- Forties Oil Field
- Artificial Lift Consortium/BP
- Forties Delta/Artificial Lift
- Water Injection Manifolds and Pipework
- Anglia Gas Field
- Conoco/Subsea Offshore Ranger-Anglia/Subsea Tie-In Anglia Pipeline. Subsea Pipeline Spool with Piggy Back Pipeline
- Alba Oil Field
- Chevron
- Subsea Drilling Template and Docking Piles. 500 Tonnes
- Amoco Central Graben/Export Pipeline from Cats Riser Platform to Forties Fabrication of Tie-In Components and Protection Structures. 80 Tonnes. 16m x 11.5m x 4m
- Forties Pipeline System
- United Kingdom
- BP
- Subsea Offshore Ltd
- Unity Platform Subsea Pipeline Tie-Ins
- FMC/Shell Nelson/Subsea EPC Contract 4 No. Wellheads Protection Covers and 1 No. Production Manifold and Protection Cover with Super Duplex Pipework. 4 x 65 Tonnes and 1 x 150 Tonnes
- Brae Complex Oil and Gas Fields
- United Kingdom
- Marathon
- Brae/Subsea: Pipeline Crossover, Protection Cover and Pipe Spools, Subsea Isolation Valve with Protection Cover
- Greater Alwyn Oil and Gas Fields
- United Kingdom
- Total Oil
- Dunbar-Ellon/Subsea Choke Manifold and Protection Cover
- 27 Tonne. 4m x 4m x 2.75m
- Brent Oil Field
- Stena/Shell
- Brent South Development/Tie-In Spools
- Fabrication of Super Duplex Pipe Spool
- Deborah Gas Field
- United Kingdom
- Coflexip Stena Offshore Limited
- Phillips
- Dawn/Deborah 2 No Wellhead Protection Structures – Dawn Weighing 45.1 Tonnes and Deborah 49.9 Tonnes
- BP Harding/TPG 500 Jack-Up Design and Fabricate Plem – Fabricate and Install 10" and 24" Oil Export Line Risers and Gravity Base Tank Distribution Pipework. Fabricate Platform Tie-Ins and Suction Anchors. Plem 60-70 Tonnes
- Erskine Oil and Gas Field
- United Kingdom
- Texaco
- Stolt Comex Seaway
- Tie-In Spools
- Mungo Oil Field & Marnock Oil Field
- BP ETAP Mungo & Marnock 2 No. Pre-Drilling Templates
- Britannia Operator Limited Britannia Fabrication of 750T Subsea Manifold with Primary Duplex Pipework, Together with Manifolds, Towheads and Trailheads for the Towed Bundles
- Coflexip Stena Shell Fulmar Riser Bundle/SSIV/Tie-In
- Kvaerner/Stolt Alliance Glas Dowr Riser Bases
- Kvaerner/Stolt Alliance Amerada Hess Durward/Dauntless 29 No Subsea Tie-In Spools
- SCS Britannia Tie-In Spools
- Kvaerner Oil & Gas BP Schiehallion 38 No. Flowline Termination Assemblies (Unit Weight Range; 7-8 Te to 58 Te)
- McDermott Marine Kingfisher Fabrication of Manifold, SSIV, Topsides and Subsea Spools
- EMC Britannia Tie-In Spools
- Mungo Oil Field & Marnock Oil Field
- BP ETAP CATS, Mungo & Marnock Waterflood Subsea Manifolds & Protection Covers
- MacCulloch Oil and Gas Field
- United Kingdom
- NSP
- MacCulloch Manifold
- Kitina and Djambala Oil Fields
- Congo
- Agip
- FMC
- Kitina - Design and Fabricate 2 No Manifolds
- EMC Ltd Europipe II Project 42" Pipeline Heads
- Elgin Franklin Gas Field
- Elf
- Smit Land & Marine
- Riser Caisson
- Alba Oil Field
- Chevron
- Halliburton
- Alba Extreme South - Caisson
- Rhum Gas Field
- United Kingdom
- BP
- Rhum - 150M Riser Caisson
- Buzzard Oil Field
- Nexen
- Saipem
- Buzzard PLEMs / Manifolds / Tie-In Spools
- Bouri Oil and Gas Field
- Libya
- AGIP
- FMC
- EPC Manifold
- Blane Oil Field
- FMC
- Blane / Wood
- Flowbases
- Dumbarton Oil Field
- United Kingdom
- Acergy
- Sub Sea Manifolds
- Acergy Tampen Provision of Hot Tap Piping and Protection Structure
- BP / AIOC Azerbaijan Provision of 2 x Subsea Manifolds
- BP/AIOC Chirag Subsea Manifold
- Scottish Area Gas Evacuation (SAGE) Pipeline
- United Kingdom
- Acergy
- Hot Tap
- Skarv Oil and Gas Field
- Norway
- BP
- VetcoGray
- 5 x Subsea Manifolds
- VetcoGray Fisher / Tuna Manifolds / Coolers
- Skarv Oil and Gas Field
- Norway
- BP
- PLEM / ERB