Difference between revisions of "Barracuda Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Petrobras * Country: Brazil * Location: 100 km from the coast of Rio de Janeiro in the Campos Basin * Production start: 2005 * Par...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 15: | Line 15: | ||
* **KBR:** Lump Sum EPC contract | * **KBR:** Lump Sum EPC contract | ||
* **Jurong Shipyard:** | * **Jurong Shipyard:** | ||
− | + | ** FPSO conversion | |
− | + | ** Fabrication of topside production modules | |
− | + | ** Integration of the Barracuda topside production modules with its newly-converted hull | |
=== History === | === History === | ||
Line 28: | Line 28: | ||
=== Links === | === Links === | ||
+ | # [[Jurong Shipyard FPSO References]] | ||
# [http://killajoules.wikidot.com/archive:jurong-shipyard-secured-a-us-80-million-fpso-convers Jurong Shipyard secured a US$80 million FPSO conversion project] | # [http://killajoules.wikidot.com/archive:jurong-shipyard-secured-a-us-80-million-fpso-convers Jurong Shipyard secured a US$80 million FPSO conversion project] | ||
# [http://killajoules.wikidot.com/archive:jurong-shipyard-s-brazillian-joint-venture-secures-f Jurong Shipyard's Brazillian Joint Venture Secures First Contract Of S$270 Million] | # [http://killajoules.wikidot.com/archive:jurong-shipyard-s-brazillian-joint-venture-secures-f Jurong Shipyard's Brazillian Joint Venture Secures First Contract Of S$270 Million] | ||
# [http://killajoules.wikidot.com/archive:halliburton-announces-significant-achievement-in-bar Halliburton Announces Significant Achievement in Barracuda-Caratinga Project] | # [http://killajoules.wikidot.com/archive:halliburton-announces-significant-achievement-in-bar Halliburton Announces Significant Achievement in Barracuda-Caratinga Project] | ||
# [http://killajoules.wikidot.com/archive:leak-in-barracuda-field Leak in Barracuda Field] | # [http://killajoules.wikidot.com/archive:leak-in-barracuda-field Leak in Barracuda Field] |
Latest revision as of 16:39, 13 December 2021
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: 100 km from the coast of Rio de Janeiro in the Campos Basin
- Production start: 2005
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The field utilises the Barracuda P 43 FPSO, which has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d
Contractors
- **KBR:** Lump Sum EPC contract
- **Jurong Shipyard:**
- FPSO conversion
- Fabrication of topside production modules
- Integration of the Barracuda topside production modules with its newly-converted hull
History
- 1989 - Barracuda Oil Field discovered
- 2005 - Production commences on the Barracuda Oil Field
- 2012 - A flaw in a pipe caused the leak 5m ³ of oil into the sea