Difference between revisions of "Barracuda Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: Petrobras * Country: Brazil * Location: 100 km from the coast of Rio de Janeiro in the Campos Basin * Production start: 2005 * Par...")
 
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:
 
* **KBR:** Lump Sum EPC contract
 
* **KBR:** Lump Sum EPC contract
 
* **Jurong Shipyard:**  
 
* **Jurong Shipyard:**  
* FPSO conversion
+
** FPSO conversion
* Fabrication of topside production modules  
+
** Fabrication of topside production modules  
* Integration of the Barracuda topside production modules with its newly-converted hull
+
** Integration of the Barracuda topside production modules with its newly-converted hull
  
 
=== History ===
 
=== History ===
Line 28: Line 28:
  
 
=== Links ===
 
=== Links ===
 +
# [[Jurong Shipyard FPSO References]]
 
# [http://killajoules.wikidot.com/archive:jurong-shipyard-secured-a-us-80-million-fpso-convers Jurong Shipyard secured a US$80 million FPSO conversion project]
 
# [http://killajoules.wikidot.com/archive:jurong-shipyard-secured-a-us-80-million-fpso-convers Jurong Shipyard secured a US$80 million FPSO conversion project]
 
# [http://killajoules.wikidot.com/archive:jurong-shipyard-s-brazillian-joint-venture-secures-f Jurong Shipyard's Brazillian Joint Venture Secures First Contract Of S$270 Million]
 
# [http://killajoules.wikidot.com/archive:jurong-shipyard-s-brazillian-joint-venture-secures-f Jurong Shipyard's Brazillian Joint Venture Secures First Contract Of S$270 Million]
 
# [http://killajoules.wikidot.com/archive:halliburton-announces-significant-achievement-in-bar Halliburton Announces Significant Achievement in Barracuda-Caratinga Project]
 
# [http://killajoules.wikidot.com/archive:halliburton-announces-significant-achievement-in-bar Halliburton Announces Significant Achievement in Barracuda-Caratinga Project]
 
# [http://killajoules.wikidot.com/archive:leak-in-barracuda-field Leak in Barracuda Field]
 
# [http://killajoules.wikidot.com/archive:leak-in-barracuda-field Leak in Barracuda Field]

Latest revision as of 16:39, 13 December 2021

Summary Information

  • Operator: Petrobras
  • Country: Brazil
  • Location: 100 km from the coast of Rio de Janeiro in the Campos Basin
  • Production start: 2005
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The field utilises the Barracuda P 43 FPSO, which has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d

Contractors

  • **KBR:** Lump Sum EPC contract
  • **Jurong Shipyard:**
    • FPSO conversion
    • Fabrication of topside production modules
    • Integration of the Barracuda topside production modules with its newly-converted hull

History

  • 1989 - Barracuda Oil Field discovered
  • 2005 - Production commences on the Barracuda Oil Field
  • 2012 - A flaw in a pipe caused the leak 5m ³ of oil into the sea

Geology

Links

  1. Jurong Shipyard FPSO References
  2. Jurong Shipyard secured a US$80 million FPSO conversion project
  3. Jurong Shipyard's Brazillian Joint Venture Secures First Contract Of S$270 Million
  4. Halliburton Announces Significant Achievement in Barracuda-Caratinga Project
  5. Leak in Barracuda Field