Barracuda P 43 FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Name: Barracuda P 43 FPSO
  • Field: Barracuda Oil Field
  • Country: Brazil
  • Ownership: Petrobras
  • Website:
  • Field Operated By: Petrobras
  • Capacity: 150,000 bpd
  • Year of Completion:

Brief Description

  • The vessel has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d. It is equipped with water injection capacity of 40,000 m3/d and can accommodate 100 personnel offshore.
  • The P-43 project involved the conversion of the 270,000 dwt VLCC Stena Continent

Contractors

  • **KBR:** Lump Sum EPC contract
  • **Jurong Shipyard:**
    • FPSO conversion
    • Fabrication of topside production modules
    • Integration of the Barracuda topside production modules with its newly-converted hull
  • **ABB:** Electrical Systems
  • **Jotun:** Painting

Status

  • In operation

History

  • 2001 - Jurong Shipyard secured the FPSO conversion project
  • 2005 - Production began

Other Information

  • -

Links

  1. ABB FPSO References
  2. Jotun FPSO References
  3. Jurong Shipyard FPSO References
  4. Nessco FPSO References
  5. Jurong Shipyard secured a US$80 million FPSO conversion project
  6. Jurong Shipyard's Brazillian Joint Venture Secures First Contract Of S$270 Million
  7. Halliburton Announces Significant Achievement in Barracuda-Caratinga Project