** The General Contractor of the project is a Polish-Italian consortium Saipem – Techint – PBG | ** The General Contractor of the project is a Polish-Italian consortium Saipem – Techint – PBG | ||
** The project was supervised by British Atkins Ltd. | ** The project was supervised by British Atkins Ltd. | ||
+ | * Expansion | ||
+ | ** TGE: Construction of LNG tank, Vapourisers and Jetty | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * The LNG terminal was completed in | + | * The LNG terminal was completed in [[LNG Terminal Projects Completed in 2016 | 2016]] |
+ | * The terminal is being expanded with the addition of another tank, 2 more vapourisers and an extra Jetty | ||
+ | * The project is scheduled for completion in 2024 | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: Qatar Gas is to supply the terminal | * Suppliers: Qatar Gas is to supply the terminal | ||
− | * Customers: Polish domestic consumption. The grid is | + | * Customers: |
+ | ** Polish domestic consumption. PGNIG has the rights to all the capacity | ||
+ | ** The grid is supplied by a new gas pipeline on the Świnoujście-Szczecin route with a diameter of 800 mm and approx. 80 km in length | ||
=== History === | === History === | ||
Line 36: | Line 42: | ||
* 2012 - EBRD signs PLN 300 million loan deal | * 2012 - EBRD signs PLN 300 million loan deal | ||
* 2012 - A study was launched into possible capacity expansion | * 2012 - A study was launched into possible capacity expansion | ||
+ | * 2016 - The terminal entered operation | ||
+ | * 2020 - Contracts for expansion project awarded | ||
=== Other Information === | === Other Information === | ||
Line 48: | Line 56: | ||
# [http://www.saipem.com/site/Home/Press/Financial/articolo6007.html Saipem: Board of Directors approves six-month report at June 30, 2010] | # [http://www.saipem.com/site/Home/Press/Financial/articolo6007.html Saipem: Board of Directors approves six-month report at June 30, 2010] | ||
# [http://www.ilf.de/en/news-info/press/details/?tx_ttnews%5Bpointer%5D=12&tx_ttnews%5Btt_news%5D=131&tx_ttnews%5BbackPid%5D=18&cHash=83d8372795d6b5b0876a945baae24591 Poland moves in new directions regarding Liquid Natural Gas Import] | # [http://www.ilf.de/en/news-info/press/details/?tx_ttnews%5Bpointer%5D=12&tx_ttnews%5Btt_news%5D=131&tx_ttnews%5BbackPid%5D=18&cHash=83d8372795d6b5b0876a945baae24591 Poland moves in new directions regarding Liquid Natural Gas Import] | ||
− | # | + | # [[Saipem LNG References]] |
# [http://killajoules.wikidot.com/archive:qatargas-signs-new-agreement-with-pgnig Qatargas signs new agreement with PGNiG] | # [http://killajoules.wikidot.com/archive:qatargas-signs-new-agreement-with-pgnig Qatargas signs new agreement with PGNiG] | ||
# [http://killajoules.wikidot.com/archive:techint-italy-wins-the-bid-with-saipem-and-pbg-for-t Techint Italy Wins the Bid with Saipem and PBG For The Regasification Terminal in Poland] | # [http://killajoules.wikidot.com/archive:techint-italy-wins-the-bid-with-saipem-and-pbg-for-t Techint Italy Wins the Bid with Saipem and PBG For The Regasification Terminal in Poland] | ||
Line 56: | Line 64: | ||
# [http://killajoules.wikidot.com/blog:3419 Polskie LNG: Świnoujście LNG Terminal’s expansion aims to meet the market demand] | # [http://killajoules.wikidot.com/blog:3419 Polskie LNG: Świnoujście LNG Terminal’s expansion aims to meet the market demand] | ||
# [http://killajoules.wikidot.com/blog:5632 PGNiG and Qatargas sign memorandum of understanding for the LNG supplies contract] | # [http://killajoules.wikidot.com/blog:5632 PGNiG and Qatargas sign memorandum of understanding for the LNG supplies contract] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/tge-signs-second-contract-for-extension.html TGE signs second contract for the extension of the LNG Terminal in Świnoujście, Poland] |
Latest revision as of 11:23, 10 August 2022
Contents
Summary Information
- Ownership: Polskie LNG
- Website: http://en.polskielng.pl/
- Location: Swinoujscie
- Capacity: 4.0 million tons/annum
- Status: In operation
Brief Description
- The facility is the first such installation in central Europe
Technical Details
- Storage capacity: Two LNG storage tanks, each with a capacity of 160,000 cubic metres
- Unloading capacity: Tankers with a capacity of up to 216,000 m³
- Send out capacity: 5 bn m³ of natural gas annually
- Constructor:
- Feasibility Study performed by an international consortium, including ILF
- The terminal was designed by Canadian SNC Lavalin Services Ltd.
- The General Contractor of the project is a Polish-Italian consortium Saipem – Techint – PBG
- The project was supervised by British Atkins Ltd.
- Expansion
- TGE: Construction of LNG tank, Vapourisers and Jetty
Ongoing Projects/Project Status
- The LNG terminal was completed in 2016
- The terminal is being expanded with the addition of another tank, 2 more vapourisers and an extra Jetty
- The project is scheduled for completion in 2024
Suppliers / Customers
- Suppliers: Qatar Gas is to supply the terminal
- Customers:
- Polish domestic consumption. PGNIG has the rights to all the capacity
- The grid is supplied by a new gas pipeline on the Świnoujście-Szczecin route with a diameter of 800 mm and approx. 80 km in length
History
- 2006 - Feasibility report awarded
- 2010 - The project received financial support from the EU
- 2011 - The EIB signs a loan agreement for the project
- 2011 - GAZ-SYSTEM S.A. signed an agreement for the construction of the Świnoujście-Szczecin gas pipeline
- 2012 - EBRD signs PLN 300 million loan deal
- 2012 - A study was launched into possible capacity expansion
- 2016 - The terminal entered operation
- 2020 - Contracts for expansion project awarded
Other Information
- Up to 310 million (€ 80 million) in funding will come from the EU
- The European Investment Bank (EIB) will provide 600 mln PLN
- The EBRD is providing PLN 300 million
Links
- Exiting the economic crisis together
- Atkins energy contract win in Poland - 10 June 2010
- Saipem: Board of Directors approves six-month report at June 30, 2010
- Poland moves in new directions regarding Liquid Natural Gas Import
- Saipem LNG References
- Qatargas signs new agreement with PGNiG
- Techint Italy Wins the Bid with Saipem and PBG For The Regasification Terminal in Poland
- Gaz-System S.A. Obtained A Loan From The EIB For The Construction Of The LNG Terminal In Świnoujście
- GAZ-SYSTEM S.A. signed an agreement for the construction of the Świnoujście-Szczecin gas pipeline
- BRD Is Helping Poland Open Up To Liquefied Gas
- Polskie LNG: Świnoujście LNG Terminal’s expansion aims to meet the market demand
- PGNiG and Qatargas sign memorandum of understanding for the LNG supplies contract
- TGE signs second contract for the extension of the LNG Terminal in Świnoujście, Poland