(Created page with "=== Summary Information === * Ownership: Polskie LNG * Website: http://en.polskielng.pl/ * Location: Swinoujscie * Capacity: million tons/annum * Status: In operation ===...")
 
Line 17: Line 17:
 
* Send out capacity: 5 bn m³ of natural gas annually
 
* Send out capacity: 5 bn m³ of natural gas annually
 
* Constructor:  
 
* Constructor:  
* Feasibility Study performed by an international consortium, including ILF  
+
** Feasibility Study performed by an international consortium, including ILF  
* The terminal was designed by Canadian SNC Lavalin Services Ltd.  
+
** The terminal was designed by Canadian SNC Lavalin Services Ltd.  
* The General Contractor of the project is a Polish-Italian consortium Saipem – Techint – PBG
+
** The General Contractor of the project is a Polish-Italian consortium Saipem – Techint – PBG
* The project is supervised by British Atkins Ltd.  
+
** The project was supervised by British Atkins Ltd.
 
 
 
 
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===

Revision as of 17:07, 15 November 2021

Summary Information

  • Ownership: Polskie LNG
  • Website: http://en.polskielng.pl/
  • Location: Swinoujscie
  • Capacity: million tons/annum
  • Status: In operation

Brief Description

  • The facility is the first such installation in central Europe


Technical Details

  • Storage capacity: Two LNG storage tanks, each with a capacity of 160,000 cubic metres
  • Unloading capacity: Tankers with a capacity of up to 216,000 m³
  • Send out capacity: 5 bn m³ of natural gas annually
  • Constructor:
    • Feasibility Study performed by an international consortium, including ILF
    • The terminal was designed by Canadian SNC Lavalin Services Ltd.
    • The General Contractor of the project is a Polish-Italian consortium Saipem – Techint – PBG
    • The project was supervised by British Atkins Ltd.

Ongoing Projects/Project Status

  • The LNG terminal is due to open in [[[LNG Terminals to be Completed in 2015 | 2015]]]


Suppliers / Customers

  • Suppliers: Qatar Gas is to supply the terminal
  • Customers: Polish domestic consumption. The grid is to be supplied by a new gas pipeline on the Świnoujście-Szczecin route with a diameter of 800 mm and approx. 80 km in length

History

  • 2006 - Feasibility report awarded
  • 2010 - The project received financial support from the EU
  • 2011 - The EIB signs a loan agreement for the project
  • 2011 - GAZ-SYSTEM S.A. signed an agreement for the construction of the Świnoujście-Szczecin gas pipeline
  • 2012 - EBRD signs PLN 300 million loan deal
  • 2012 - A study was launched into possible capacity expansion

Other Information

  • Up to 310 million (€ 80 million) in funding will come from the EU
  • The European Investment Bank (EIB) will provide 600 mln PLN
  • The EBRD is providing PLN 300 million

Links

  1. Exiting the economic crisis together
  2. Atkins energy contract win in Poland - 10 June 2010
  3. Saipem: Board of Directors approves six-month report at June 30, 2010
  4. Poland moves in new directions regarding Liquid Natural Gas Import
  5. [[[Saipem LNG References]]]
  6. Qatargas signs new agreement with PGNiG
  7. Techint Italy Wins the Bid with Saipem and PBG For The Regasification Terminal in Poland
  8. Gaz-System S.A. Obtained A Loan From The EIB For The Construction Of The LNG Terminal In Świnoujście
  9. GAZ-SYSTEM S.A. signed an agreement for the construction of the Świnoujście-Szczecin gas pipeline
  10. BRD Is Helping Poland Open Up To Liquefied Gas
  11. Polskie LNG: Świnoujście LNG Terminal’s expansion aims to meet the market demand
  12. PGNiG and Qatargas sign memorandum of understanding for the LNG supplies contract