Map Ta Phut Thailand LNG Terminal

From A Barrel Full
Revision as of 14:44, 25 June 2022 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: PTT LNG * Website: http://www.pttlng.com/ * Location: Map Ta Phut Thailand * Capacity: 5.0 million tons/annum * Status: In operatio...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Ownership: PTT LNG
  • Website: http://www.pttlng.com/
  • Location: Map Ta Phut Thailand
  • Capacity: 5.0 million tons/annum
  • Status: In operation

+++ Brief Description

  • A large single train LNG gasification terminal

+++ Technical Details

  • Storage capacity: 160,000 m3 x 2
  • Unloading capacity: LNG vessels size with 125,000 to 264,000 cubic meters capacity
  • Send out capacity: 700 mmscfd
  • Constructor:
* **Fluor:** Project Management and Consultant role
* **GS/Kogas/HYC/DEC:** Integrated engineering, procurement, construction and commissioning services of a re-gasification and send-out system, a marine jetty with complete ship unloading facilities and two large full containment LNG storage tanks.
* **Freyssinet:** Pre-stressing for LNG tanks 


+++ Ongoing Projects/Project Status

  • Project was completed in [[[LNG Terminals to be Completed in 2011 | 2011]]]
  • PTT is planning to double the capacity of the terminal


+++ Suppliers / Customers

  • Suppliers:
* PTT has signed a deal to buy 1 million tonnes of LNG a year from Qatar from late 2011
* PTT also plans to buy LNG in spot markets in 2011-2014 if market conditions are favourable
  • Customers: The area has petrochemical, refinery, steel and fertiliser industries


+++ History

  • 2006 - Fluor awarded Project Management and Consultant role
  • 2008 - Consortium of GS/Kogas/HYC/DEC awarded construction contract
  • 2011 - The terminal receives its first cargo
  • 2011 - Terminal opening
  • 2012 - PTT – Qatargas sign 20-year LNG supply agreement

+++ Other Information

  • This construction of LNG receiving terminal in Thailand is the first overseas LNG terminal project as Korean E&C companies.

Links

  1. Freyssinet LNG Tank References
  2. 540 USD mil Overseas LNG Terminal Plant Award
  3. Thailand LNG Project Development and Outlook
  4. GS E&C-Led Team wins the first LNG Re-gasification Terminal Contract in Thailand
  5. Thailand's first LNG terminal to operate from July-PTT
  6. QATARGAS COMMISSIONS THAILAND’S FIRST LNG RECEIVING TERMINAL
  7. Thailand Minister of Energy inaugurates sixth gas separation plant and LNG terminal
  8. $400m LNG expansion
  9. PTT – Qatargas sign 20-year LNG supply agreement for energy reserve, greater national energy security with a supply start-up planned for early 2015