Difference between revisions of "OAL Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: Mukran * Destination: Lubmin * Ownership: Gascade * Website: https://www.gascade.de/ * Length: 50 kilometres ( miles) * Capacity: per...") |
Abarrelfull (talk | contribs) |
||
Line 21: | Line 21: | ||
=== Links === | === Links === | ||
# [https://www.gascade.de/en/our-network/our-pipelines/oal Gascade, OAL] | # [https://www.gascade.de/en/our-network/our-pipelines/oal Gascade, OAL] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/ostsee-anbindungsleitung-mechanically.html "Ostsee Anbindungsleitung" Mechanically Completed] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:Germany]] | [[category:Germany]] | ||
[[category:Gascade]] | [[category:Gascade]] |
Revision as of 21:13, 9 May 2024
Summary Information
- Source: Mukran
- Destination: Lubmin
- Ownership: Gascade
- Website: https://www.gascade.de/
- Length: 50 kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- The offshore pipeline will connect the Lubmin Floating LNG Terminal in the port of Mukran with the German pipeline network in Lubmin.
- The pipeline connects to the OPAL pipeline and European Gas Pipeline Link (EUGAL)
History
- 2024 - The pipeline began operations
Other Information
- -