Difference between revisions of "Devils Tower Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
* Operator: ENI | * Operator: ENI | ||
+ | * [[ENI Oil and Gas Fields]] | ||
* Country: USA | * Country: USA | ||
* Location: Mississippi Canyon Blocks 728, 771, 772 & 773, Gulf of Mexico | * Location: Mississippi Canyon Blocks 728, 771, 772 & 773, Gulf of Mexico |
Latest revision as of 11:19, 17 July 2023
Summary Information
- Operator: ENI
- ENI Oil and Gas Fields
- Country: USA
- Location: Mississippi Canyon Blocks 728, 771, 772 & 773, Gulf of Mexico
- Production start: 2004
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- Devils Tower has the world’s deepest dry-tree spar in 5,610 feet of water on Mississippi Canyon Block 773
- The design of the Devils Tower facility, consists of hull, mooring system, topsides and production facilities
- The hull, is 586 feet in length, 94 feet in diameter and weighed over 11,000 tons at the time of installation whilst the topside weighs over 9,300 tons
- The Spar acts as a central hub for a number of satellite fields, including Triton Goldfinger Gas Field, Bass Lite Gas Field and the Kodiak Oil Field
- Gas is transported via the Canyon Chief Natural Gas Pipeline to the Transcontinental Gas Pipe Line (TRANSCO)
Contractors
- **J. Ray McDermott:** Design, engineering, procurement, fabrication, installation and commissioning of the offshore production facility
- **Coflexip Stena Offshore:** Design, procurement, installation and commissioning of two 18" export pipelines, totalling 160 miles (260km)
- **FMC Technologies:** Surface wellhead and tree systems
- **Emerson:** Spar - Engineering, Control System, Safety system
History
- 1999 - Devils Tower Oil And Gas Field discovered
- 2001 - Development of Devils Tower Field sanctioned
- 2002 - Dominion Announces Successful Devils Tower Development Drilling Program
- 2004 - Devils Tower Spar installed & production started
- 2005 - Production starts at the satellite [[[Triton Goldfinger Gas Field]]]
- 2006 - Marubeni acquired Pioneer's Stake
- 2007 - Eni completes the acquisition of Devils Tower Oil And Gas Field
- 2008 - Production starts at the satellite [[[Bass Lite Gas Field]]]
Geology
Links
- Gulf Of Mexico Discoveries In Water Depths Greater Than 5000
- Gulf Of Mexico Permanent Deepwater Structures
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- McDermott Platform References
- Serimax Pipeline References
- Pioneer Sanctions Development of Devils Tower Field, Updates Deepwater Activity
- Coflexip Stena Offshore Wins Large EPCI Pipeline Contract for the Devils Tower Deepwater Export Lines in the Gulf of Mexico
- FMC Technologies Unit Chosen to Provide Surface Wellhead Solutions for Devils Tower Spar and Medusa Spar Deepwater Projects in Gulf of Mexico
- J. Ray McDermott Completes Devils Tower Spar Project
- Dominion E&P Announces Successful Devils Tower Development Drilling Program And Triton Satellite Discovery
- Dominion E&P Announces First Production At Triton/Goldfinger
- Pioneer Closes Sale of Deepwater Gulf of Mexico Assets
- Eni completes the acquisition of Dominion's assets in the Gulf of Mexico
- Mariner Energy Achieves First Production at Bass Lite Deepwater Gulf of Mexico Project