Canyon Chief Natural Gas Pipeline
Jump to navigation
Jump to search
Summary Information
- Source:
- Destination: MP 261A
- Ownership: Williams
- Website:
- Length: kilometres (98.5 miles)
- Capacity: per day
- Status: Operating
+++ Details
- A 98.5-mile natural gas gathering pipeline connecting the Devils Tower platform and the Blind Faith natural gas lateral to MP 261A on the continental shelf where connection is made to the Transcontinental Gas Pipe Line (TRANSCO)
- The natural gas from this system is primarily delivered to Williams’ Mobile Bay gas processing plant in Coden, Ala.
+++ History
- -
+++ Other Information
- -
+++ Links