* Operator: GDF Suez
 +
* Country: Norway
 +
* Location: off the coast of the city of Florø
 +
* Production start: 2010
 +
* Partners: Wintershall, Okea 12%
 +
* Type: Oil & Gas
 +
* Estimated Reserves:
 +
* Production Volume:
  
Operator: GDF Suez
+
=== Description ===
Country: Norway
+
* Gjøa was discovered in 1989. It is a combined oil and gas field located off the coast of the Norwegian city of Florø.
Location: off the coast of the city of Florø
+
* Statoil (owner of 20 %) is the operator in the field development phase, while Gaz de France (30 %) will be the operator. The other partners are Petoro (30 %), AS Norske Shell (12 %), RWE Dea Norge AS (8 %).
Production start: 2010
+
* The. Camilla, Belinda and Fram B fields (known as CBB and operated by Hydro) will be connected to the Gjøa semisubmersible platform by a common flowline subsea tie-back solution.
Partners: Wintershall, Okea 12%
+
* Gas from the Gjoa platform will be exported to Scotland via the British pipeline Flags, while the oil will be transported in the Troll II pipeline to Statoil's Mongstad refinery near Bergen, Norway.
Type: Oil & Gas
+
* The Gjøa production facilities topsides measures 110 meters long and 85 meters wide and weighs in just below the 20.000 tonnes mark. The hull weighs 14.200 tonnes.
Estimated Reserves:
+
* The [[Vega Gas And Condensate Field]] is tied back to Gjoa
Production Volume:
 
Description
 
  
Gjøa was discovered in 1989. It is a combined oil and gas field located off the coast of the Norwegian city of Florø.
+
=== Contractors ===
Statoil (owner of 20 %) is the operator in the field development phase, while Gaz de France (30 %) will be the operator. The other partners are Petoro (30 %), AS Norske Shell (12 %), RWE Dea Norge AS (8 %).
 
The. Camilla, Belinda and Fram B fields (known as CBB and operated by Hydro) will be connected to the Gjøa semisubmersible platform by a common flowline subsea tie-back solution.
 
Gas from the Gjoa platform will be exported to Scotland via the British pipeline Flags, while the oil will be transported in the Troll II pipeline to Statoil's Mongstad refinery near Bergen, Norway.
 
The Gjøa production facilities topsides measures 110 meters long and 85 meters wide and weighs in just below the 20.000 tonnes mark. The hull weighs 14.200 tonnes.
 
The Vega Gas And Condensate Field is tied back to Gjoa
 
Contractors
 
  
Samsung Heavy: Semi-submersible hull construction
+
* **Samsung Heavy:** Semi-submersible hull construction
Technip: Fabrication and installation of the infield pipelines
+
* **Technip:** Fabrication and installation of the infield pipelines
Aker Kvaerner:
+
* **Aker Kvaerner:**
Manufacture and supply of 16 kilometres of dynamic and static umbilicals
+
* Manufacture and supply of 16 kilometres of dynamic and static umbilicals
Detail design of topside and hull, procurement, construction and hook-up of topside, and mating of topside and hull
+
* Detail design of topside and hull, procurement, construction and hook-up of topside, and mating of topside and hull
Saipem: Pipeline Installation of Gjoa Export Pipelines
+
* **Saipem:** Pipeline Installation of Gjoa Export Pipelines
Dresser-Rand: Provision of three centrifugal compressor trains driven by variable speed electric motors, and one DATUM compressor package driven by a gas turbine
+
* **Dresser-Rand:** Provision of three centrifugal compressor trains driven by variable speed electric motors, and one DATUM compressor package driven by a gas turbine
ABB: Building a 98-kilometer underwater link from Mongstad
+
* **ABB:** Building a 98-kilometer underwater link from Mongstad
History
 
  
1989 - Gjøa was discovered
+
=== History ===
2006 - Statoil and Aker Kvaerner signed a MOU for the contract for the semisubmersible platform
+
* 1989 - Gjøa was discovered
2007 - Gjoa umbilicals contract awarded to Aker Kvaerner
+
* 2006 - Statoil and Aker Kvaerner signed a MOU for the contract for the semisubmersible platform
2007 - Aker Kvaerner awarded floater installation contract
+
* 2007 - Gjoa umbilicals contract awarded to Aker Kvaerner
2007 - ABB awarded subsea cable contract
+
* 2007 - Aker Kvaerner awarded floater installation contract
2010 - Production started
+
* 2007 - ABB awarded subsea cable contract
2013 - Statoil reduced its stake to 5%
+
* 2010 - Production started
2014 - Statoil sold its stake to Wintershall
+
* 2013 - Statoil reduced its stake to 5%
2018 - Okea acquires Shell's stake
+
* 2014 - Statoil sold its stake to Wintershall
Geology
+
* 2018 - Okea acquires Shell's stake
  
The reservoir contains gas above a relatively thin oil zone in Jurassic sandstones in the Viking, Brent and Dunlin Groups. The field comprises several tilted fault segments with partly uncertain communication and variable reservoir quality. The reservoir depth is about 2 200 metres.
+
=== Geology ===
 +
* The reservoir contains gas above a relatively thin oil zone in Jurassic sandstones in the Viking, Brent and Dunlin Groups. The field comprises several tilted fault segments with partly uncertain communication and variable reservoir quality. The reservoir depth is about 2 200 metres.
  
 
=== Links ===
 
=== Links ===

Revision as of 12:42, 20 December 2021

Summary Information

  • Operator: GDF Suez
  • Country: Norway
  • Location: off the coast of the city of Florø
  • Production start: 2010
  • Partners: Wintershall, Okea 12%
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Gjøa was discovered in 1989. It is a combined oil and gas field located off the coast of the Norwegian city of Florø.
  • Statoil (owner of 20 %) is the operator in the field development phase, while Gaz de France (30 %) will be the operator. The other partners are Petoro (30 %), AS Norske Shell (12 %), RWE Dea Norge AS (8 %).
  • The. Camilla, Belinda and Fram B fields (known as CBB and operated by Hydro) will be connected to the Gjøa semisubmersible platform by a common flowline subsea tie-back solution.
  • Gas from the Gjoa platform will be exported to Scotland via the British pipeline Flags, while the oil will be transported in the Troll II pipeline to Statoil's Mongstad refinery near Bergen, Norway.
  • The Gjøa production facilities topsides measures 110 meters long and 85 meters wide and weighs in just below the 20.000 tonnes mark. The hull weighs 14.200 tonnes.
  • The Vega Gas And Condensate Field is tied back to Gjoa

Contractors

  • **Samsung Heavy:** Semi-submersible hull construction
  • **Technip:** Fabrication and installation of the infield pipelines
  • **Aker Kvaerner:**
* Manufacture and supply of  16 kilometres of dynamic and static umbilicals
* Detail design of topside and hull, procurement, construction and hook-up of topside, and mating of topside and hull
  • **Saipem:** Pipeline Installation of Gjoa Export Pipelines
  • **Dresser-Rand:** Provision of three centrifugal compressor trains driven by variable speed electric motors, and one DATUM compressor package driven by a gas turbine
  • **ABB:** Building a 98-kilometer underwater link from Mongstad

History

  • 1989 - Gjøa was discovered
  • 2006 - Statoil and Aker Kvaerner signed a MOU for the contract for the semisubmersible platform
  • 2007 - Gjoa umbilicals contract awarded to Aker Kvaerner
  • 2007 - Aker Kvaerner awarded floater installation contract
  • 2007 - ABB awarded subsea cable contract
  • 2010 - Production started
  • 2013 - Statoil reduced its stake to 5%
  • 2014 - Statoil sold its stake to Wintershall
  • 2018 - Okea acquires Shell's stake

Geology

  • The reservoir contains gas above a relatively thin oil zone in Jurassic sandstones in the Viking, Brent and Dunlin Groups. The field comprises several tilted fault segments with partly uncertain communication and variable reservoir quality. The reservoir depth is about 2 200 metres.

Links

  1. NPD, Gjoa
  2. International Protective Coatings Platform References
  3. Samsung Platform References
  4. Saipem Europe Pipeline References
  5. Gjøa semisubmersible platform to Aker Kvaerner
  6. Gjoa umbilicals contract to Aker Kvaerner
  7. Aker Kvaerner awarded another floater installation contract
  8. Dresser-Rand Selected to Provide Equipment for Gjoa Offshore Project
  9. Technip awarded contract by statoil for installation of Gjøa infield pipelines in Norway
  10. ABB wins $72-million order for oil-platform cable
  11. Gjøa comes on stream
  12. GDF SUEZ takes over operatorship of the Norwegian gas & oil field Gjøa
  13. Transaction to realise value and secure long-term growth on the NCS
  14. Transaction with Wintershall on Norwegian continental shelf now completed
  15. Realising value to further strengthen NCS portfolio
  16. Shell to sell Draugen and Gjøa interests to OKEA AS
  17. TechnipFMC Awarded a Substantial Integrated EPCI (iEPCI™) Contract for the Neptune Energy Duva and Gjøa P1 Projects