Difference between revisions of "Bonan Block Oil and Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: CNOOC * Country: China * Location: Bohai Bay * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...")
 
 
Line 14: Line 14:
  
 
+++ Contractors
 
+++ Contractors
* **COOEC:** Pipeline installation
+
* COOEC: Pipeline installation
 +
* BOEC: BoZhong 28-1 WHPs Upgrading: Deck, Heli-deck, Topside
  
 
+++ History
 
+++ History
Line 25: Line 26:
  
 
+++ Links
 
+++ Links
 +
# [[Jotun Asia Platform References]]
 
# [[Serimax Asia Pipeline References]]
 
# [[Serimax Asia Pipeline References]]
 
# [http://killajoules.wikidot.com/archive:cnooc-limited-and-shell-to-study-gas-development-in CNOOC Limited and Shell to Study Gas Development in Bohai Bay]
 
# [http://killajoules.wikidot.com/archive:cnooc-limited-and-shell-to-study-gas-development-in CNOOC Limited and Shell to Study Gas Development in Bohai Bay]
 
# [http://killajoules.wikidot.com/archive:cnooc-and-shell-sign-production-sharing-contract-for CNOOC and Shell Sign Production Sharing Contract for Bohai Bay]
 
# [http://killajoules.wikidot.com/archive:cnooc-and-shell-sign-production-sharing-contract-for CNOOC and Shell Sign Production Sharing Contract for Bohai Bay]
 
# [http://killajoules.wikidot.com/archive:bonan-fields-commence-production Bonan Fields Commence Production]
 
# [http://killajoules.wikidot.com/archive:bonan-fields-commence-production Bonan Fields Commence Production]

Latest revision as of 14:01, 17 November 2023

Summary Information

  • Operator: CNOOC
  • Country: China
  • Location: Bohai Bay
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The Bonan Block is comprised of several oil and gas fields. Two key structures, Bozhong 26-2 and Bozhong 28-1, and the other 3 fields hold a recoverable reserve of more than 160 million barrels of liquid and around 300 billion cubic feet of associated natural gas.
  • Major production facilities include a single point mooring system (SPM), a floating production, storage and offloading facility (FPSO), two wellhead platforms, an onshore terminal and subsea pipelines.

+++ Contractors

  • COOEC: Pipeline installation
  • BOEC: BoZhong 28-1 WHPs Upgrading: Deck, Heli-deck, Topside

+++ History

  • 2001 - Shell & CNOOC sign agreement to study block
  • 2002 - PSC signed
  • 2004 - First production

+++ Geology

+++ Links

  1. Jotun Asia Platform References
  2. Serimax Asia Pipeline References
  3. CNOOC Limited and Shell to Study Gas Development in Bohai Bay
  4. CNOOC and Shell Sign Production Sharing Contract for Bohai Bay
  5. Bonan Fields Commence Production