Difference between revisions of "Bonan Block Oil and Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: CNOOC * Country: China * Location: Bohai Bay * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...") |
Abarrelfull (talk | contribs) |
||
Line 14: | Line 14: | ||
+++ Contractors | +++ Contractors | ||
− | + | * COOEC: Pipeline installation | |
+ | * BOEC: BoZhong 28-1 WHPs Upgrading: Deck, Heli-deck, Topside | ||
+++ History | +++ History | ||
Line 25: | Line 26: | ||
+++ Links | +++ Links | ||
+ | # [[Jotun Asia Platform References]] | ||
# [[Serimax Asia Pipeline References]] | # [[Serimax Asia Pipeline References]] | ||
# [http://killajoules.wikidot.com/archive:cnooc-limited-and-shell-to-study-gas-development-in CNOOC Limited and Shell to Study Gas Development in Bohai Bay] | # [http://killajoules.wikidot.com/archive:cnooc-limited-and-shell-to-study-gas-development-in CNOOC Limited and Shell to Study Gas Development in Bohai Bay] | ||
# [http://killajoules.wikidot.com/archive:cnooc-and-shell-sign-production-sharing-contract-for CNOOC and Shell Sign Production Sharing Contract for Bohai Bay] | # [http://killajoules.wikidot.com/archive:cnooc-and-shell-sign-production-sharing-contract-for CNOOC and Shell Sign Production Sharing Contract for Bohai Bay] | ||
# [http://killajoules.wikidot.com/archive:bonan-fields-commence-production Bonan Fields Commence Production] | # [http://killajoules.wikidot.com/archive:bonan-fields-commence-production Bonan Fields Commence Production] |
Latest revision as of 14:01, 17 November 2023
Summary Information
- Operator: CNOOC
- Country: China
- Location: Bohai Bay
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Bonan Block is comprised of several oil and gas fields. Two key structures, Bozhong 26-2 and Bozhong 28-1, and the other 3 fields hold a recoverable reserve of more than 160 million barrels of liquid and around 300 billion cubic feet of associated natural gas.
- Major production facilities include a single point mooring system (SPM), a floating production, storage and offloading facility (FPSO), two wellhead platforms, an onshore terminal and subsea pipelines.
+++ Contractors
- COOEC: Pipeline installation
- BOEC: BoZhong 28-1 WHPs Upgrading: Deck, Heli-deck, Topside
+++ History
- 2001 - Shell & CNOOC sign agreement to study block
- 2002 - PSC signed
- 2004 - First production
+++ Geology
+++ Links