Difference between revisions of "Sergipe LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
=== History === | === History === | ||
− | * | + | * 2020 - The terminal was commissioned |
+ | * 2021 - New Fortress Energy acquires the terminal | ||
=== Other Information === | === Other Information === |
Revision as of 08:53, 18 January 2022
Contents
Summary Information
- Ownership: New Fortress Energy
- Website: https://www.newfortressenergy.com/
- Location: Port of Sergipe, Brazil
- Capacity: million tons/annum
- Status: In Operation
Brief Description
- The terminal utilises the Golar Nanook Floating Storage and Regasification Unit (FSRU) located 8.5km off the coast
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- The terminal was commissioned in 2020
Suppliers / Customers
- Suppliers:
- Customers: The FRSU is connected by pipeline to CELSE’s Usina Termoelétrica (UTE) Porto de Sergipe I combined-cycle gas-fired power plant
History
- 2020 - The terminal was commissioned
- 2021 - New Fortress Energy acquires the terminal
Other Information
-