Difference between revisions of "Malikai Oil And Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: Malaysia * Location: 110 kilometres offshore of the Malaysian state of Sabah * Production start: 2013 * Partners: Shell (35....") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 32: | Line 32: | ||
+++ Links | +++ Links | ||
+ | # [[Serimax Asia Pipeline References]] | ||
# [http://killajoules.wikidot.com/archive:mmc-amec-wins-engineering-studies-for-shells-malikai MMC AMEC wins engineering studies for Shell’s Malikai Deepwater project] | # [http://killajoules.wikidot.com/archive:mmc-amec-wins-engineering-studies-for-shells-malikai MMC AMEC wins engineering studies for Shell’s Malikai Deepwater project] | ||
# [http://www.conocophillips.com/EN/about/worldwide_ops/asia-me/Pages/Malaysia.aspx Conocophillips, Malaysia] | # [http://www.conocophillips.com/EN/about/worldwide_ops/asia-me/Pages/Malaysia.aspx Conocophillips, Malaysia] | ||
# [http://killajoules.wikidot.com/blog:3802 Technip in a JV with MMHE awarded substantial contract for the Malikai Project in Malaysia] | # [http://killajoules.wikidot.com/blog:3802 Technip in a JV with MMHE awarded substantial contract for the Malikai Project in Malaysia] | ||
# [http://killajoules.wikidot.com/blog:3830 Technip awarded important subsea contract by Shell for the Malikai project] | # [http://killajoules.wikidot.com/blog:3830 Technip awarded important subsea contract by Shell for the Malikai project] |
Latest revision as of 10:10, 26 October 2023
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: 110 kilometres offshore of the Malaysian state of Sabah
- Production start: 2013
- Partners: Shell (35.0%), ConocoPhillips (35.0%), PETRONAS (30.0%)
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Situated on Block G offshore Sabah, Malaysia in a water depth of 1,854 feet (565 meters)
- The platform will be a ‘dry-tree’ tension leg design in which the topsides are supported on a buoyant semi-submersible structure tethered by tendons to the sea bed.
- The TLP will be designed as a fully-manned platform. The TLP will weigh approximately 26,000 metric tonnes incorporating a topsides, which will have facilities to process 60,000 barrels of oil and 1.4 million cubic meters per day of gas, and a hull.
- The pipelines connect the Malikai tension leg platform site to the Kebabangan platform
- Oil and Gas will be sent to The Sabah Oil and Gas Terminal (SOGT)
+++ Contractors
- **MMC AMEC:** basic engineering studies for the flow lines, risers, topside and hull for the Malikai platform
- **Technip / MMHE:** Engineering, procurement and construction of a tension leg platform (TLP)
- **Technip:** Transportation, installation and pre-commissioning of a 8” 50-kilometer gas pipeline and a 10” 55-kilometer liquid pipeline including steel catenary risers.
+++ History
- 2004 - Malikai Oil And Gas Field Discovered
- 2009 - MMC AMEC wins basic engineering award
- 2013 - Technip / MMHE awarded contract for the engineering, procurement and construction of a tension leg platform
- 2013 - Technip awarded subsea contract