Difference between revisions of "Lone Star West Texas Gateway NGL Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Source: Permian and Delaware Basins in West Texas | * Source: Permian and Delaware Basins in West Texas | ||
Line 8: | Line 8: | ||
** http://www.energytransfer.com | ** http://www.energytransfer.com | ||
* Length: kilometres (570 miles) | * Length: kilometres (570 miles) | ||
− | * Capacity: | + | * Capacity: 495,000 barrels of oil per day |
* Crude Type: natural gas liquids (NGLs) | * Crude Type: natural gas liquids (NGLs) | ||
− | + | === Brief Description === | |
* The 570-mile, 16-inch pipeline, transports natural gas liquids (NGLs) produced in the Permian and Delaware Basins in West Texas to Mont Belvieu, Texas | * The 570-mile, 16-inch pipeline, transports natural gas liquids (NGLs) produced in the Permian and Delaware Basins in West Texas to Mont Belvieu, Texas | ||
+ | * It connects with the [[Justice NGL Pipeline]] | ||
+ | * In 2020 an extension of the pipeline into the Permian Basin, with originations near Wink, Texas, connecting to 30-inch mainline near Fort Worth, Texas. | ||
− | + | === Pipeline Status === | |
* Operating | * Operating | ||
− | + | === History === | |
* 2012 - Energy Transfer Partners and Regency Energy Partners Announce Early Completion of the Gateway Pipeline | * 2012 - Energy Transfer Partners and Regency Energy Partners Announce Early Completion of the Gateway Pipeline | ||
+ | * 2016 - Pipeline expanded to 375,000 bpd and then 495,000 bpd | ||
+ | * 2020 - The pipeline was extended to Fort Worth | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
− | + | # [[EIA Liquids Pipeline Projects 2010-2014]] | |
+ | # [[EIA Liquids Pipeline Projects 2015-2020]] | ||
# [http://killajoules.wikidot.com/blog:3486 Energy Transfer Partners and Regency Energy Partners Announce Early Completion of Lone Star’s Gateway Pipeline] | # [http://killajoules.wikidot.com/blog:3486 Energy Transfer Partners and Regency Energy Partners Announce Early Completion of Lone Star’s Gateway Pipeline] |
Latest revision as of 13:38, 28 September 2023
Contents
Summary Information
- Source: Permian and Delaware Basins in West Texas
- Destination: Mont Belvieu, Texas
- Ownership: Energy Transfer Partners, and Regency Energy Partners
- Website:
- Length: kilometres (570 miles)
- Capacity: 495,000 barrels of oil per day
- Crude Type: natural gas liquids (NGLs)
Brief Description
- The 570-mile, 16-inch pipeline, transports natural gas liquids (NGLs) produced in the Permian and Delaware Basins in West Texas to Mont Belvieu, Texas
- It connects with the Justice NGL Pipeline
- In 2020 an extension of the pipeline into the Permian Basin, with originations near Wink, Texas, connecting to 30-inch mainline near Fort Worth, Texas.
Pipeline Status
- Operating
History
- 2012 - Energy Transfer Partners and Regency Energy Partners Announce Early Completion of the Gateway Pipeline
- 2016 - Pipeline expanded to 375,000 bpd and then 495,000 bpd
- 2020 - The pipeline was extended to Fort Worth
Other Information
- -