Difference between revisions of "Pao de Acucar - Seat and Gavea Oil and Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
* Country: Brazil
 
* Country: Brazil
 
* Location: BM-C-33 block of the Campos Basin
 
* Location: BM-C-33 block of the Campos Basin
* Production start:  
+
* Production start: Expected 2028
* Partners:  
+
* Partners: Equinor 35 % (operator), Repsol Sinopec Brasil 35 %, Petrobras 30%
 
* Type: Oil / Gas
 
* Type: Oil / Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
Line 10: Line 10:
  
 
=== Description ===
 
=== Description ===
* The fields will utilise an FPSO which will have topsides designed to produce approximately 125,000 barrels of crude oil per day as well as produce and export approximately 565 million standard cubic feet of associated gas per day. Its minimum storage capacity of crude oil will be 2,000,000 barrels.
+
* Located in the Campos Basin, BM-C-33 comprises three different pre-salt discoveries – Pão de Açúcar, Gávea and Seat – containing natural gas and oil/condensate recoverable reserves above one billion barrels of oil equivalent.
 +
* The fields will utilise the [[BM C 33 FPSO]] which will have topsides designed to produce approximately 125,000 barrels of crude oil per day as well as produce and export approximately 565 million standard cubic feet of associated gas per day. Its minimum storage capacity of crude oil will be 2,000,000 barrels.
 +
* The sales gas is planned to be exported through a 200 kilometres offshore gas pipeline from the FPSO to Cabiúnas, in the city of Macaé, in the state of Rio de Janeiro.
  
 
=== Contractors ===
 
=== Contractors ===
 
* Modec: FEED and EPCI for FPSO
 
* Modec: FEED and EPCI for FPSO
 +
* TechnipFMC: Subsea umbilicals, risers and flowlines (SURF), integrated engineering, procurement, construction and installation
  
 
=== History ===
 
=== History ===
* 2023 - Final investment decision
+
* 2010 - Fields discovered by Repsol Sinopec
 +
* 2016 - Equinor became operator
 +
* 2022 - FEED contracts awarded
 +
* 2023 - Final investment decision and EPCI contracts awarded
  
 
=== Geology ===
 
=== Geology ===
Line 22: Line 28:
  
 
=== Links ===
 
=== Links ===
 +
# [https://a-barrel-full.blogspot.com/2023/05/equinor-and-partners-announce-final.html Equinor and partners announce final investment decision for BM-C-33, in Brazil]
 
# [https://a-barrel-full.blogspot.com/2023/05/modec-awarded-contract-by-equinor-to.html MODEC Awarded Contract by Equinor to Supply the 2nd FPSO in Brazil]
 
# [https://a-barrel-full.blogspot.com/2023/05/modec-awarded-contract-by-equinor-to.html MODEC Awarded Contract by Equinor to Supply the 2nd FPSO in Brazil]
 
+
# [https://a-barrel-full.blogspot.com/2023/05/equinor-awards-two-major-contracts-for.html Equinor awards two major contracts for the BM-C-33 project in Brazil]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:Brazil]]
 
[[category:Brazil]]
 
[[category:Equinor]]
 
[[category:Equinor]]

Latest revision as of 14:22, 12 July 2023

Summary Information

  • Operator: Equinor
  • Country: Brazil
  • Location: BM-C-33 block of the Campos Basin
  • Production start: Expected 2028
  • Partners: Equinor 35 % (operator), Repsol Sinopec Brasil 35 %, Petrobras 30%
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Located in the Campos Basin, BM-C-33 comprises three different pre-salt discoveries – Pão de Açúcar, Gávea and Seat – containing natural gas and oil/condensate recoverable reserves above one billion barrels of oil equivalent.
  • The fields will utilise the BM C 33 FPSO which will have topsides designed to produce approximately 125,000 barrels of crude oil per day as well as produce and export approximately 565 million standard cubic feet of associated gas per day. Its minimum storage capacity of crude oil will be 2,000,000 barrels.
  • The sales gas is planned to be exported through a 200 kilometres offshore gas pipeline from the FPSO to Cabiúnas, in the city of Macaé, in the state of Rio de Janeiro.

Contractors

  • Modec: FEED and EPCI for FPSO
  • TechnipFMC: Subsea umbilicals, risers and flowlines (SURF), integrated engineering, procurement, construction and installation

History

  • 2010 - Fields discovered by Repsol Sinopec
  • 2016 - Equinor became operator
  • 2022 - FEED contracts awarded
  • 2023 - Final investment decision and EPCI contracts awarded

Geology

Links

  1. Equinor and partners announce final investment decision for BM-C-33, in Brazil
  2. MODEC Awarded Contract by Equinor to Supply the 2nd FPSO in Brazil
  3. Equinor awards two major contracts for the BM-C-33 project in Brazil