BM C 33 FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Name:
  • Field: Pao de Acucar - Seat and Gavea Oil and Gas Fields
  • Country: Brazil
  • Ownership:
  • Website:
  • Field Operated By: Equinor
  • Capacity: bpd
  • Year of Completion:

Brief Description

  • The vessel will have topsides designed to produce approximately 125,000 barrels of crude oil per day as well as produce and export approximately 565 million standard cubic feet of associated gas per day. Its minimum storage capacity of crude oil will be 2,000,000 barrels.

Contractors

  • Modec: FEED and EPCI for FPSO
  • Baker Hughes: gas turbine generators and steam turbine generator technology

Status

  • Under construction

History

  • 2023 - Modec awarded EPCI for the vessel

Other Information

  • -

Links

  1. MODEC Awarded Contract by Equinor to Supply the 2nd FPSO in Brazil
  2. Baker Hughes Awarded Significant Gas Technology Contract to Support Equinor’s BM-C-33 Project in Brazil