Difference between revisions of "Borouge 4 Petrochemical Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
=== History === | === History === | ||
− | * Technip awarded Engineering, Procurement, and Construction (EPC) contract | + | * 2021 - Technip awarded Engineering, Procurement, and Construction (EPC) contract |
+ | * 2022 - Maire Tecnimont awarded three EPC contracts | ||
=== Links === | === Links === |
Revision as of 16:29, 13 December 2022
Contents
Summary Information
- Ownership: Borouge
- Website: https://www.borouge.com/
- Location: Ruwais
The Project
- Description: A world-scale ethane cracker with capacity of more than 1.5 million tonnes per annum of ethylene and two new polyethylene plants - each with a capacity of 700,000 tonnes per annum, using the third generation of Borealis Borstar® technology
- Constructor:
- Technip Energies: Engineering, Procurement, and Construction (EPC)
- Maire Tecnimont: EPC Lump Sum turnkey contracts relate to the execution of three packages of the Borouge 4 project: the “polyolefin units package”, which includes two polyethylene units with a capacity of 700,000 tons per year each, and 1-hexene (1) unit; the “cross-linkable polyethylene (2) unit package”; the “utilities and offsites package”, which includes the utilities and offsites units for the whole Borouge 4 project.
- Licensors:
Production Units
- ethane cracker
- two polyethylene plants
Raw Materials Supply
- -
Products Produced
- Polyethylene
Other Information
- The project is an extension of the Borouge Petrochemical Complex
History
- 2021 - Technip awarded Engineering, Procurement, and Construction (EPC) contract
- 2022 - Maire Tecnimont awarded three EPC contracts