Difference between revisions of "Calcasieu Pass LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 40: | Line 40: | ||
# [http://killajoules.wikidot.com/archive:cb-i-awarded-storage-tank-contract-by-venture-global CB&I Awarded Storage Tank Contract by Venture Global LNG] | # [http://killajoules.wikidot.com/archive:cb-i-awarded-storage-tank-contract-by-venture-global CB&I Awarded Storage Tank Contract by Venture Global LNG] | ||
# [https://lng-news.blogspot.com/2021/11/pgnig-will-purchase-more-natural-gas.html PGNiG will purchase more natural gas from Venture Global LNG] | # [https://lng-news.blogspot.com/2021/11/pgnig-will-purchase-more-natural-gas.html PGNiG will purchase more natural gas from Venture Global LNG] | ||
+ | # [https://lng-news.blogspot.com/2021/12/venture-global-lng-and-cnooc-gas-power.html Venture Global LNG and CNOOC Gas & Power Announce LNG Sales and Purchase Agreements] |
Revision as of 15:36, 21 December 2021
Contents
Summary Information
- Ownership: Venture Global
- Website: http://venturegloballng.com/
- Location: Cameron Parish, Louisiana
- Capacity: 10.0 million tons/annum
- Status: Planned
Brief Description
- Calcasieu Pass will have an export capacity of ten million (10,000,000) metric tonnes per year of liquefied natural gas and will accommodate ocean-going vessels with an LNG carrying capacity of up to 185,000 cubic meters.
- The design is modular with eighteen * 0.626 MTPA liquefaction trains configured in 9 blocks
- Also included on the project site will be two full containment LNG storage units, each with a usable capacity of approximately 200,000 cubic meters
Technical Details
- Storage capacity: 400,000 cubic meters
- Constructor:
- CB&I: Storage tanks
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2022
Suppliers / Customers
- Suppliers: Gas is supplied to the terminal by the TransCameron Pipeline a 23.4-mile-long lateral Pipeline which brings feed gas from interconnections with ANR Pipeline Company (ANR), Texas Eastern Transmission Gas Pipeline, and Bridgeline Gas Pipeline System to the Terminal site.
- Customers: PGNIG has contracted 1.5 million tons for delivery to Świnoujście Polskie LNG Terminal or elsewhere
History
- 2104 - Project announced
- 2017 - Storage tank contract awarded
- 2018 - FERC environmental impact assessment published
- 2018 - PGNIG signed a contract for 1.0 million tons per annum
- 2021 - PGNIG increased their contract to 1.5 million tons per annum
Other Information
- -