Tamar Floating LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Noble, Delek, and Isramco
  • Website: http://www.nobleenergyinc.com/
  • Location: Offshore Israel
  • Capacity: 3.0 million tons/annum
  • Status: Planned

+++ Brief Description

  • A Floating LNG processing terminal

+++ Technical Details

  • Storage capacity:
  • Constructor:
    • **DSME** - Construction of floating platform
    • **Höegh LNG** - Front-end engineering design (FEED)
    • **KBR** - pre-FEED study
  • Licensor:

+++ Ongoing Projects/Project Status

  • Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]

+++ Suppliers / Customers

  • Suppliers: The [[[Tamar Gas Field]]] and [[[Dalit Gas Field]]]
  • Customers: Gazprom Marketing & Trading

+++ History

  • 2011 - DSME signs agrrement to develop the field and FPSO
  • 2011 - Höegh LNG - Awarded engineering studies
  • 2012 - A Letter of Intent was signed with Gazprom Marketing & Trading
  • 2012 - KBR awarded contract to provide the pre-FEED study
  • 2013 - Gazprom Marketing and Trading signs Heads of Agreements


+++ Other Information

  • -

Links

  1. DSME makes an Agreement with Israel for Gas Field
  2. Noble Energy Announces Heads of Agreement to Evaluate Floating LNG, Offshore Israel
  3. Höegh LNG - Awarded engineering studies for LNG FPSO offshore Israel
  4. Gazprom Marketing and Trading Discusses Marketing of the LNG from Israel
  5. KBR Selected to Execute Two FLNG Studies for Hoegh LNG
  6. FLNG Pre-FEED Complete Successfully
  7. Gazprom Marketing and Trading signs Heads of Agreements with Tamar upstream consortium