SeaRose FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Name: Sea Rose FPSO
  • Field: White Rose Oil Field
  • Country: Canada
  • Ownership: Husky
  • Website:
  • Field operated By: Husky
  • Capacity: 100,000 bpd
  • Year of Completion: 2005

+++ Brief Description

  • The vessel measures 892-ft in length, 150-ft wide with a 89-ft draft and is equipped with storage of approximately one million barrels of oil and topsides processing capacities of 100 000b/d of oil, 150 million scf/d of gas, 180 000b/d of water and 270 000b/d of water injection and is moored on a disconnectable turret.

+++ Contractors

  • **Maersk Contractors:** Front-End Engineering Design (FEED) contract for the FPSO
  • **Samsung Heavy Industries:** Contract to build the floating production, storage, and offloading (FPSO) vessel hull
  • **SBM IMODCO:** Contract for the design and fabrication of the turret and mooring system
  • **Kiewit:** $774 million lump-sum, fixed-price-and-date contract for engineering, procuring and constructing (EPC) the 11,000-tonne White Rose FPSO (Floating, Production, Storage, Offloading) topsides


+++ Status

  • In operation

+++ History

  • 2000 - Maersk Contractors Newfoundland Limited was awarded the Front-End Engineering Design (FEED) contract for the FPSO
  • 2002 - Topsides contract awarded
  • 2004 - Husky Energy's SeaRose FPSO Arrives in Marystown
  • 2005 - Vessel completed

+++ Other Information

  • -

+++ Links

  1. Samsung FPSO References
  2. White Rose awards development contracts for Hull, Turret, and Topsides
  3. SeaRose FPSO Arrives at White Rose Oil Field
  4. Husky Energy's SeaRose FPSO Arrives in Marystown